City of Richardson Fire Department, Fire Marshal's Office
In short
City of Richardson Fire Department, Fire Marshal's Office issues 2 permits we publish for Richardson, last verified 2026-08-27. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.
What this agency issues
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Fire Protection System Construction Permit | City of Richardson Fire Department, Fire Marshal's Office | 1% of the total cost of the system, minimum $60 per system; flammable and combustible liquids including demolition or abandonment of an underground storage tank $100; hazardous materials $100; high-piled combustible storage $100; temporary membrane structures and tents $50 | per permit | 2026-08-27 |
| Fire Code Operational Permitonly if it applies to you | City of Richardson Fire Department, Fire Marshal's Office | $50–$100 per permit, then annual renewal | 1 year | 2026-08-27 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
About each permit
Fire Protection System Construction Permit
One per cent of the system cost with a $60 floor per system — a rate rather than a band, which makes it unusually easy to estimate from a contractor's quote: a $40,000 sprinkler installation is $400. The named flat permits sit alongside it at $100 each for flammable and combustible liquids, hazardous materials and high-piled combustible storage. The liquids line expressly covers demolishing or abandoning an underground storage tank and its piping, which is the one an auto repair or fuel site meets when closing rather than opening. Re-review is free once, then half the original fee up to $250 for each further round; re-inspection is free once, then $100 each.
Fire Code Operational Permit
$100 for each operational permit authorised under section 105.6 of the fire code, then $50 a year to renew. Which operations need one comes from the adopted fire code rather than the fee schedule, so read the code before assuming you need none. Gates and barricades across fire apparatus access roads are their own line at $50 a year per system. The costly provision is failure: commencing operation before obtaining a required permit adds a fee equal to the original permit fee, up to $2,000, on top of the permit itself.
Contact
- Jurisdiction
- Richardson
- Phone
- Not verified — use the website
Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.
Sources
Every fee and term above was read from one of these government pages on the date shown.
- City of Richardson Code of Ordinances, Appendix B — Master Fee Schedule (adopted by Ord. No. 4559, § 2, 15 September 2025; amended by Ord. No. 4560, § 1, 13 October 2025)City of Richardson · primary source · retrieved 2026-08-27
Other offices serving Richardson
The full permit list for this jurisdiction
Industry permit lists that include this agency
Texas jurisdictions
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.