Business licenses and permits in Waco, Texas

McLennan County. Waco is one of the few Texas cities that still runs a general business licensing regime alongside its permits: night clubs, farmers markets, indoor amusement facilities, open air vending and sexually oriented businesses each need a named license with its own inspection fee. Food permits are issued county-wide by the Waco-McLennan County Public Health District, so the same fees apply outside the city limits.

What are you opening in Waco?

Permits that apply to every type of business in Waco

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Certificate of OccupancyCity of Waco Inspection Services$50 per change of recorddoes not expire; a new certificate is required on a change of occupancy classification, tenancy, ownership, business name or type of business2026-08-24
Temporary Certificate of Occupancyonly if it applies to youCity of Waco Inspection Services$200–$400 initial 30 days, then per extension30 days initially, extendable twice by 15 days2026-08-24
Sign Permitonly if it applies to youCity of Waco Inspection Services$48–$110 by sign areaoff-premise sign registration is annual, due 1 October2026-08-24
Commercial Plan Review FeeCity of Waco Inspection Servicesthe greater of $100 or 25% of the total building permit feeone-time, per application2026-08-24
Commercial Building PermitCity of Waco Inspection Services$0.28 per sq ft for the first 100,000 sq ft, then $0.14 per sq ftrenewal is 50% of the original permit fee, minimum $602026-08-24
Commercial Alteration and Repair PermitCity of Waco Inspection Services$50 minimum to $2,000 of valuation; $50 for the first $2,000 plus $5.50 per additional $1,000 to $50,000; $265 plus $4.50 per $1,000 to $100,000; $490 plus $3.50 per $1,000 to $500,000; $1,890 plus $2.50 per $1,000 above thatrenewal is 50% of the original permit fee, minimum $602026-08-24
Commercial Electrical PermitCity of Waco Inspection Services$24 per service up to 400 amps, $38.50 to 1,000 amps, $52 above 1,000 amps, plus $6.50 per one-pole circuit, $7.50 per two-pole, $8.50 per three-pole, $12 per motor to 50 HP and $26.50 aboverenewal is 50% of the original permit fee, minimum $602026-08-24

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

What do these permits involve in Waco?

Certificate of Occupancy

A building may not be used or occupied until the Building Official issues the certificate, which happens after the building passes final inspection. Waco's trigger list is broader than most and was rewritten in November 2025: a new certificate is required not only on first occupancy and on a change of occupancy classification under IBC Chapter 3, but on a change of tenancy or ownership of the space, a change in the name or ownership of the business, and a change in the type of business — the city's own examples include turning retail into a restaurant or a hair salon, and adding a coffee shop to an existing space. Single and two-family dwellings are excluded. The $50 shown is the certificate of occupancy change of record fee on the permit schedule; the certificate issued at the end of a construction permit is covered by that permit.

Temporary Certificate of Occupancy

$200 for the initial 30 days, $300 for the first 15-day extension and $400 for the second. The price rises deliberately with each extension, so a project that opens on a temporary certificate and drifts pays $900 over 60 days. Clean and Show — utilities released so a space can be prepared or shown, without occupancy — is $75.

Sign Permit

$48 up to 72 sq ft, $83 from 73 to 300 sq ft, and $110 from 301 to 672 sq ft, plus a $60 sign plan review and a $15 technology fee. The part that catches operators is the annual side: off-premise signs must be re-registered every 1 October at $25 to $40 by size, the late fee is per sign, and it doubles after 60 days. A portable sign is $66 and sign demolition $50.

Commercial Plan Review Fee

Non-refundable, and the floor bites on small projects: a fit-out whose permit fee is $200 still pays $100 to have the plans looked at. Re-review after corrections is $60, changing the design or scope after issue is $60 plus 10% of the original permit fee, and an ICC third-party plan review is $200 an hour. Transferring the permit to a different contractor is $60.

Commercial Building Permit

Waco prices commercial construction on floor area rather than declared valuation, which is unusual in Texas and much easier to estimate before design is finished: $0.28 a square foot to 100,000 sq ft and $0.14 above it, the same rates whether the occupancy is assembly, business, educational, factory, hazardous, mercantile or multi-family residential, and the same again for storage and shell buildings. A technology fee of $15 is added to building permits. Starting work before the permit issues doubles the fee, and the schedule is explicit that paying the doubled fee does not excuse the underlying non-compliance.

Commercial Alteration and Repair Permit

This is the schedule most new tenants actually meet: repairs and alterations to an existing non-residential building, and completion of shell buildings, are valuation-based even though new construction is area-based. A $150,000 restaurant fit-out lands at roughly $665 in building permit fees. Reinspection escalates rather than repeating — $55 for the first failure, $100 for the second, $150 for the third and beyond — and the schedule notes that the contractor stays liable for failed reinspection fees even where the project itself is exempt from permit fees.

Commercial Electrical Permit

Itemised rather than banded, so the estimate depends on the drawing rather than the budget. A commercial administration fee of $60 and a technology fee of $15 sit on top, a standalone commercial electrical permit review is $60, and an electrical sign circuit is $40. Contractors must create an account, register the company and show proof of state licensing and insurance naming the City of Waco as certificate holder before any trade permit issues — build that into the programme, not the fee estimate.

Sources

Every figure in the table above was read from one of these government pages on the date shown.

  1. Permit Fee SchedulesCity of Waco Inspection Services · primary source · retrieved 2026-08-24
  2. Certificate of Occupancy — Sec. 6-37 as amended by Ordinance No. 2025-814City of Waco Inspection Services · primary source · retrieved 2026-08-24

Who issues business permits in Waco?

Permitting in Waco is split across 3 agencies we hold records for, with tax registration handled at state level. No single office issues everything, which is why an opening usually means filing in several places rather than one.

Waco issuing agencies

Other Texas jurisdictions we cover

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.