Lubbock
City of Lubbock Engineering Services
In short
City of Lubbock Engineering Services issues 2 permits we publish for Lubbock, last verified 2026-08-24. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.
What this agency issues
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Public Infrastructure Plan Review, Testing and Inspectiononly if it applies to you | City of Lubbock Engineering Services | Plan review is the greater of a $100 minimum or the unit rate — $0.25 per linear foot of water pipe, $0.30 per linear foot of sewer pipe, $0.50 per linear foot of curb. Testing and inspection is a $200 administration fee plus $0.65 per linear foot of water pipe, $0.95 per linear foot of sewer pipe or $0.65 per square yard of pavement | per project | 2026-08-24 |
| Drainage, Grading and Cut-and-Fill Reviewonly if it applies to you | City of Lubbock Engineering Services | $25–$3,500 per review, by type and acreage | per review | 2026-08-24 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
About each permit
Public Infrastructure Plan Review, Testing and Inspection
These are the charges for putting public water, sewer or paving into the ground — a new-build or a subdivision meets them, a fit-out in an existing unit does not. Review and inspection are priced separately and both are charged per plan type, so a site laying all three pays six charges. Inspection is much the dearer of the two: sewer inspection at 95 cents a linear foot is more than three times the 30-cent review rate. Note the two methods differ — review is the GREATER of the minimum or the unit rate, while inspection is the administration fee PLUS the unit rate.
Drainage, Grading and Cut-and-Fill Review
A drainage analysis report is $300 reviewed by the rational method and $600 where a unit hydrograph model is used — so the modelling method you choose doubles the fee. A re-review is $100. Grading plans are $250 for the first acre and $25 for each additional, capped at $1,000. Cut and fill is $100 for the first acre and $25 for each additional, capped at $3,500 — a much higher ceiling than grading, which is the number to watch on a site needing significant earthworks.
Contact
- Jurisdiction
- Lubbock
- Phone
- Not verified — use the website
Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.
Sources
Every fee and term above was read from one of these government pages on the date shown.
- City of Lubbock Public Infrastructure Plan Review, Testing and Inspection Fees, November 2023City of Lubbock Engineering Services · primary source · retrieved 2026-08-24
Other offices serving Lubbock
The full permit list for this jurisdiction
Industry permit lists that include this agency
Texas jurisdictions
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.
