20 permits · verified 2026-08-24
What permits do you need to open a restaurant in Lubbock?
In short
A restaurant in Lubbock, TX has 7 permits that apply to every business of this type, plus 13 more that depend on your premises, signage or how you are set up. City of Lubbock Department of Building Safety charges $75 per site for the sign permit. 14 of the 20 are charged as a range or formula rather than a flat fee. Verified 2026-08-24 against the issuing agencies’ published fee schedules.
Permits particular to a restaurant in Lubbock
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Food Establishment Permit | City of Lubbock Environmental Health | $100–$350 by risk band | not stated in the published material | 2026-08-24 |
| Temporary Food Permitonly if it applies to you | City of Lubbock Environmental Health | $52 per permit | under 14 days | 2026-08-24 |
| Sample Permitonly if it applies to you | City of Lubbock Environmental Health | $25 for the first two days, then $5 for each day after | not stated in the published material | 2026-08-24 |
| Food Processing Permitonly if it applies to you | City of Lubbock Environmental Health | $135–$205 per year, by floor area | not stated in the published material | 2026-08-24 |
| Grit Interceptor and Oil/Water Separator Permitonly if it applies to you | City of Lubbock Department of Building Safety | $75 per permit | per permit | 2026-08-24 |
| Contractor Registration | City of Lubbock Department of Building Safety | $0–$65 per year | 1 year, running 1 January to 31 December | 2026-08-24 |
| Fire Operational Permit and Occupant Load Signonly if it applies to you | City of Lubbock Fire Marshal's Office | $30–$2,000 per permit, by type | per permit or per event | 2026-08-24 |
| Zoning and Platting Applicationonly if it applies to you | City of Lubbock Planning Department | $50–$1,500 per application, by type | per application | 2026-08-24 |
| Public Infrastructure Plan Review, Testing and Inspectiononly if it applies to you | City of Lubbock Engineering Services | Plan review is the greater of a $100 minimum or the unit rate — $0.25 per linear foot of water pipe, $0.30 per linear foot of sewer pipe, $0.50 per linear foot of curb. Testing and inspection is a $200 administration fee plus $0.65 per linear foot of water pipe, $0.95 per linear foot of sewer pipe or $0.65 per square yard of pavement | per project | 2026-08-24 |
| Drainage, Grading and Cut-and-Fill Reviewonly if it applies to you | City of Lubbock Engineering Services | $25–$3,500 per review, by type and acreage | per review | 2026-08-24 |
| Mixed Beverage Permit (MB)only if it applies to you | Texas Alcoholic Beverage Commission | $2,650–$5,300 per two-year period; $5,300 original, $2,650 renewal | every 2 years | 2026-08-21 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
Local permits that apply to every type of business in Lubbock
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Sign Permitonly if it applies to you | City of Lubbock Department of Building Safety | $75 per site | per permit | 2026-08-24 |
| Commercial Building Permit | City of Lubbock Department of Building Safety | Varies — formula on the Lubbock page | per permit; an expired permit renews at 50% of the original fee | 2026-08-24 |
| Certificate of Occupancy | City of Lubbock Department of Building Safety | Varies — formula on the Lubbock page | not stated in the published schedule | 2026-08-24 |
| Mechanical, Plumbing and Electrical Permitonly if it applies to you | City of Lubbock Department of Building Safety | Varies — formula on the Lubbock page | per permit | 2026-08-24 |
| Fire Protection System Plan Review | City of Lubbock Fire Marshal's Office | Varies — formula on the Lubbock page | per review | 2026-08-24 |
| Final Fire Inspection | City of Lubbock Fire Marshal's Office | Varies — formula on the Lubbock page | per inspection | 2026-08-24 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
TX registrations that apply to every type of business
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Certificate of Formationonly if it applies to you | Texas Secretary of State | $300 one-time filing | no expiry | 2026-08-20 |
| Assumed Name Certificate (DBA)only if it applies to you | Texas Secretary of State | $25 one-time filing | up to ten years, renewable | 2026-08-21 |
| Texas Sales and Use Tax Permit | Texas Comptroller of Public Accounts | No fee — there is no fee for this permit | no expiry while actively engaged in business | 2026-08-21 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
How much does it actually cost to permit a restaurant in Lubbock?
There is no single figure, and any site quoting one is rounding away the part that matters. Of the 20 records listed for a restaurant in Lubbock, TX, 7 apply to every business of this type and 13 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.
Of the 7 that always apply, 1 carry a flat fee, coming to $0.00. That is a floor, not a total. 14 of the 20 are charged as a range or a formula set by the issuing agency, and 0 have no fee published at all. The ones particular to this business that vary:
Food Establishment Permit: $100–$350 by risk band
Sample Permit: $25 for the first two days, then $5 for each day after
Food Processing Permit: $135–$205 per year, by floor area
Contractor Registration: $0–$65 per year
Fire Operational Permit and Occupant Load Sign: $30–$2,000 per permit, by type
Zoning and Platting Application: $50–$1,500 per application, by type
Public Infrastructure Plan Review, Testing and Inspection: Plan review is the greater of a $100 minimum or the unit rate — $0.25 per linear foot of water pipe, $0.30 per linear foot of sewer pipe, $0.50 per linear foot of curb. Testing and inspection is a $200 administration fee plus $0.65 per linear foot of water pipe, $0.95 per linear foot of sewer pipe or $0.65 per square yard of pavement
Drainage, Grading and Cut-and-Fill Review: $25–$3,500 per review, by type and acreage
Mixed Beverage Permit (MB): $2,650–$5,300 per two-year period; $5,300 original, $2,650 renewal
The other 5 variable fees belong to permits that apply to every type of business here; their formulas are set out on the Lubbock permits page and the TX state page.
Is Lubbock expensive for a restaurant?
Comparing like with like — only the permits charged as a single flat fee, since a valuation formula has no figure to rank — Lubbock sits where the table below puts it against every other TX jurisdiction covered here that publishes the same permit.
Sign Permit: Lubbock charges $75. Across 5 jurisdictions it runs from $75 here to $114 in Amarillo, with a median of $88. Nowhere else covered here charges less.
Read the spread rather than the rank. Sign Permit varies by $39 between the cheapest and dearest jurisdiction here, which is the sort of gap worth knowing before you sign a lease on one side of a city line rather than the other.
Which offices issue these permits in Lubbock?
Permits for a restaurant in Lubbock, TX come from 8 separate offices: City of Lubbock Department of Building Safety, City of Lubbock Environmental Health, City of Lubbock Fire Marshal's Office, City of Lubbock Planning Department, City of Lubbock Engineering Services, Texas Alcoholic Beverage Commission, Texas Secretary of State, Texas Comptroller of Public Accounts. No single office issues them all, which is why an opening means filing in several places rather than one.
- City of Lubbock Department of Building SafetyIssues 6 permits on this page, including Sign Permit, Commercial Building Permit, Certificate of Occupancy1314 Avenue K, 1st Floor Annex, Lubbock, TX 79401www.mylubbock.us/923/Permits
- City of Lubbock Environmental HealthIssues 4 permits on this page: Food Establishment Permit, Temporary Food Permit, Sample Permit, Food Processing Permit1902 Texas Avenue, Lubbock, TX · 806-775-3000www.mylubbock.us/188/Environmental-Health
- City of Lubbock Fire Marshal's OfficeIssues 3 permits on this page: Fire Protection System Plan Review, Final Fire Inspection, Fire Operational Permit and Occupant Load Sign1515 E Ursuline Street, Lubbock, TX 79403www.mylubbock.us/589/Fire-Department-Permits
- City of Lubbock Planning DepartmentIssues 1 permit on this page: Zoning and Platting Application1625 13th Street, Lubbock, TX 79401www.mylubbock.us/636/Fee-Schedule
- City of Lubbock Engineering ServicesIssues 2 permits on this page: Public Infrastructure Plan Review, Testing and Inspection, Drainage, Grading and Cut-and-Fill Review1625 13th Street, Lubbock, TX 79401www.mylubbock.us/279/Engineering-Services
- Texas Alcoholic Beverage CommissionIssues 1 permit on this page: Mixed Beverage Permit (MB)www.tabc.texas.gov
- Texas Secretary of StateIssues 2 permits on this page: Certificate of Formation, Assumed Name Certificate (DBA)www.sos.state.tx.us
- Texas Comptroller of Public AccountsIssues 1 permit on this page: Texas Sales and Use Tax Permitcomptroller.texas.gov/taxes/permit
What does a restaurant need in Lubbock that other businesses do not?
1 of the 11 permits particular to a restaurant here applies to no other business type we cover in Lubbock: Mixed Beverage Permit (MB).
Food Establishment Permit
Four risk bands: $100 at risk 1, $175 at risk 2, $270 at risk 3 and $350 at risk 4. The $100 entry point is the lowest standing food permit in this dataset — Midland starts at $150, Waco at $258 and Frisco at $300 — though the $350 top band lands close to the middle of the pack rather than the bottom. Anyone serving food to the public needs one, with two published exemptions: non-profit organisations that do not charge for food, such as soup kitchens, and charitable organisations selling only prepackaged non-potentially-hazardous items like cookies, cakes or brownies as a fundraiser. Getting one is an in-person process at 1902 Texas Avenue: bring a set of blueprints identifying the kitchen area, restrooms and all equipment placement, complete the application, then schedule a risk assessment and a pre-opening inspection before paying. The risk assessment is what sets your band, so the blueprint stage is where the annual fee is effectively decided.
Temporary Food Permit
$52 flat under the department's Senate Bill 1008 notice. Lubbock previously charged $50 for the first two days and $10 for each day after, so a full fourteen-day run came to $170. The department's Senate Bill 1008 notice states the permit is revised to $52, which is the figure DSHS charges and the ceiling SB 1008 sets, so a fortnight-long stall now costs less than a third of what it did. The same notice consolidates a facility holding several retail food permits into one permit at its highest risk level, and moves non-profits to an inspection basis rather than a permit.
Food Processing Permit
Banded by floor area rather than risk: $135 up to 1,000 sq ft, $160 from 1,001 to 5,000, $180 from 5,001 to 10,000 and $205 above 10,000. The spread is unusually flat — a 20,000 sq ft processor pays only $70 more than a 900 sq ft one — so Lubbock is notably cheap for a large food manufacturing operation. Separate from the food establishment permit, which is priced on risk.
Contractor Registration
$65 a year for every contractor except mechanical, electrical and plumbing, which register free — the schedule states plainly that their fees are waived by state law. The insurance requirement is the substantial part rather than the fee: a $20,000 compliance bond or $100,000 of general liability cover. The registration period is fixed to the calendar year rather than to the date of issue, so registering in November buys two months. Changing contractor mid-job costs $250 or the original fee, whichever is lower, where the scope does not change; where it does, the full permit and plan review fees start again.
Drainage, Grading and Cut-and-Fill Review
A drainage analysis report is $300 reviewed by the rational method and $600 where a unit hydrograph model is used — so the modelling method you choose doubles the fee. A re-review is $100. Grading plans are $250 for the first acre and $25 for each additional, capped at $1,000. Cut and fill is $100 for the first acre and $25 for each additional, capped at $3,500 — a much higher ceiling than grading, which is the number to watch on a site needing significant earthworks.
Mixed Beverage Permit (MB)
Read directly from the TABC two-year licensing fee schedule: Mixed Beverage Permit (MB) $5,300 original, $2,650 renewal, charged on a two-year cycle. A Wine and Malt Beverage Retailer's Permit (BG) is $1,900 if you do not need spirits. Note a widely-cited competitor lists $6,006 for this permit, which does not appear in the TABC schedule.
Shared with other businesses in Lubbock
- Sample Permit — City of Lubbock Environmental Health, $25 for the first two days, then $5 for each day after, not stated in the published material. Also required for retail stores and coffee shops; what it involves is set out on the retail stores page.
- Grit Interceptor and Oil/Water Separator Permit — City of Lubbock Department of Building Safety, $75 per permit, per permit. Also required for auto repair shops, coffee shops and contractors and trades; what it involves is set out on the coffee shops page.
- Fire Operational Permit and Occupant Load Sign — City of Lubbock Fire Marshal's Office, $30–$2,000 per permit, by type, per permit or per event. Also required for coffee shops, retail stores, fitness studios and contractors and trades; what it involves is set out on the fitness studios page.
- Zoning and Platting Application — City of Lubbock Planning Department, $50–$1,500 per application, by type, per application. Also required for auto repair shops, retail stores, childcare centres, veterinary clinics, fitness studios and contractors and trades; what it involves is set out on the veterinary clinics page.
- Public Infrastructure Plan Review, Testing and Inspection — City of Lubbock Engineering Services, Plan review is the greater of a $100 minimum or the unit rate — $0.25 per linear foot of water pipe, $0.30 per linear foot of sewer pipe, $0.50 per linear foot of curb. Testing and inspection is a $200 administration fee plus $0.65 per linear foot of water pipe, $0.95 per linear foot of sewer pipe or $0.65 per square yard of pavement, per project. Also required for contractors and trades and retail stores; what it involves is set out on the retail stores page.
The other 6 local permits in the tables apply to every type of business in Lubbock, TX; what each one involves is set out on the Lubbock permits page. The 3 state-level registrations apply to every type of business across TX and are covered on the TX state page.
How does a restaurant compare with other businesses in Lubbock?
The closest match is a retail store, which shares 9 of these permits. A restaurant also needs Grit Interceptor and Oil/Water Separator Permit and Mixed Beverage Permit (MB). A retail store needs Flammable Liquid and LPG Tank Permit, which a restaurant does not.
| Business | Its own permits | Shared with a restaurant | Only a restaurant needs | Only it needs |
|---|---|---|---|---|
| Retail stores | 10 | 9 | 2 | 1 |
| Contractors and trades | 9 | 7 | 4 | 2 |
| Coffee shops | 5 | 5 | 6 | 0 |
| Auto repair shops | 5 | 4 | 7 | 1 |
| Fitness studios | 3 | 2 | 9 | 1 |
| Food trucks | 2 | 1 | 10 | 1 |
| Salons and barbers | 2 | 1 | 10 | 1 |
| Childcare centres | 3 | 1 | 10 | 2 |
| Veterinary clinics | 3 | 1 | 10 | 2 |
Sources
Every figure for the permits explained on this page was read from one of these government pages on the date shown. Sources for the permits shared with other businesses are listed with their explanations on the retail stores page, coffee shops page, fitness studios page and veterinary clinics page. Sources for the permits that apply to every type of business are listed on the Lubbock permits page and the TX state page. Confirmed by Editorial Team.
- Environmental Health — Food Establishment Permit types and feesCity of Lubbock · primary source · retrieved 2026-08-24
- City of Lubbock Environmental Health — Senate Bill 1008 notice on permitting and permitting fees for food establishmentsCity of Lubbock Environmental Health Department · primary source · retrieved 2026-08-24
- City of Lubbock Building Safety Fee Schedule, 1 October 2025 to 30 September 2026 (adopted under budget Ordinance No. 2024-O0111)City of Lubbock Department of Building Safety · primary source · retrieved 2026-08-24
- City of Lubbock Public Infrastructure Plan Review, Testing and Inspection Fees, November 2023City of Lubbock Engineering Services · primary source · retrieved 2026-08-24
- Two-Year Licensing Fees — TABCTexas Alcoholic Beverage Commission · primary source · retrieved 2026-08-22
Related
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.
