24 permits · verified 2026-08-24
What permits do you need to open a restaurant in Pasadena?
In short
A restaurant in Pasadena, TX has 10 permits that apply to every business of this type, plus 14 more that depend on your premises, signage or how you are set up. City of Pasadena Permit Department charges $150 per application, covering the inspections for the certificate of occupancy — change of use or occupancy. 10 of the 24 are charged as a range or formula rather than a flat fee. Verified 2026-08-24 against the issuing agencies’ published fee schedules.
The permits at a glance
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Commercial Building Permit | City of Pasadena Permit Department | $0.20 per square foot under roof, never less than $100 | not stated in the published fee schedule | 2026-08-24 |
| Commercial Plan Review Fee | City of Pasadena Permit Department | $0.10 per square foot under roof — half the building permit rate — with a minimum of $100 and a maximum of $2,000 | one-time, per application | 2026-08-24 |
| Certificate of Occupancy — Change of Use or Occupancy | City of Pasadena Permit Department | $150 per application, covering the inspections | does not expire; a new certificate is required on a change of use or occupancy | 2026-08-24 |
| Certificate of Occupancy Issued With a Building Permit | City of Pasadena Permit Department | $50 added to the permit and plan review fees | does not expire; a new certificate is required on a change of use or occupancy | 2026-08-24 |
| Temporary Certificate of Occupancy or Letter of Completiononly if it applies to you | City of Pasadena Permit Department | $50 per certificate | not stated in the published fee schedule | 2026-08-24 |
| Temporary Utility Releaseonly if it applies to you | City of Pasadena Permit Department | $50 per 90-day release | up to 90 days, renewable in further 90-day periods | 2026-08-24 |
| Commercial Roofing Permitonly if it applies to you | City of Pasadena Permit Department | $50 per structure, plus the $10 application fee | not stated in the published fee schedule | 2026-08-24 |
| Commercial Demolition Permitonly if it applies to you | City of Pasadena Permit Department | $100 per commercial demolition | 30 days, or the duration of the remodel project | 2026-08-24 |
| Commercial Exhaust Hood Permitonly if it applies to you | City of Pasadena Permit Department | $50–$100 per hood, by class | not stated in the published fee schedule | 2026-08-24 |
| Commercial Electrical Service Permit | City of Pasadena Permit Department | $50–$200 per service, by amperage | not stated in the published fee schedule | 2026-08-24 |
| Electrical Sign Permitonly if it applies to you | City of Pasadena Permit Department | $40–$75 per circuit, by sign type | not stated in the published fee schedule | 2026-08-24 |
| Paving and Parking Repair Permitonly if it applies to you | City of Pasadena Permit Department | $60 minimum, per permit | not stated in the published fee schedule | 2026-08-24 |
| Food Establishment Permit | City of Pasadena Public Health Department | $260–$460 per year, by risk category | one permitted year | 2026-08-24 |
| Temporary Food Establishment Permitonly if it applies to you | City of Pasadena Public Health Department | $52 for 1 to 14 days | 1 to 14 days | 2026-08-24 |
| Liquid Waste Transporter Permitonly if it applies to you | City of Pasadena Public Health Department | Not published | not stated in the published material | 2026-08-24 |
| Fire and Life Safety Operating Permit — Assembly Occupancy | City of Pasadena Fire Marshal's Office | $250–$500 per year, by occupant load | one year, renewed annually | 2026-08-24 |
| Annual Fire and Life Safety Inspection | City of Pasadena Fire Marshal's Office | $65 per hour — $65, $130, $195 or $260 for one to four hours | annual | 2026-08-24 |
| Commercial Fire Alarm Permitonly if it applies to you | City of Pasadena Fire Marshal's Office | $100 per year, renewal $50 | one year | 2026-08-24 |
| Fire Plan Review — Building | City of Pasadena Fire Marshal's Office | $230–$900 by building area | one-time, per review | 2026-08-24 |
| Temporary Membrane Structure and Tent Permitonly if it applies to you | City of Pasadena Fire Marshal's Office | $125 per permit | per event | 2026-08-24 |
| Mixed Beverage Permit (MB)only if it applies to you | Texas Alcoholic Beverage Commission | $2,650–$5,300 per two-year period; $5,300 original, $2,650 renewal | every 2 years | 2026-08-21 |
| Certificate of Formationonly if it applies to you | Texas Secretary of State | $300 one-time filing | no expiry | 2026-08-20 |
| Assumed Name Certificate (DBA)only if it applies to you | Texas Secretary of State | $25 one-time filing | up to ten years, renewable | 2026-08-21 |
| Texas Sales and Use Tax Permit | Texas Comptroller of Public Accounts | No fee — there is no fee for this permit | no expiry while actively engaged in business | 2026-08-21 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
How much does it actually cost to permit a restaurant in Pasadena?
There is no single figure, and any site quoting one is rounding away the part that matters. Of the 24 records listed for a restaurant in Pasadena, TX, 10 apply to every business of this type and 14 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.
Of the 10 that always apply, 3 carry a flat fee, coming to $200.00. That is a floor, not a total. 10 of the 24 are charged as a range or a formula set by the issuing agency, and 1 has no fee published at all. The ones that vary:
Commercial Building Permit: $0.20 per square foot under roof, never less than $100
Commercial Plan Review Fee: $0.10 per square foot under roof — half the building permit rate — with a minimum of $100 and a maximum of $2,000
Commercial Exhaust Hood Permit: $50–$100 per hood, by class
Commercial Electrical Service Permit: $50–$200 per service, by amperage
Electrical Sign Permit: $40–$75 per circuit, by sign type
Food Establishment Permit: $260–$460 per year, by risk category
Fire and Life Safety Operating Permit — Assembly Occupancy: $250–$500 per year, by occupant load
Annual Fire and Life Safety Inspection: $65 per hour — $65, $130, $195 or $260 for one to four hours
Fire Plan Review — Building: $230–$900 by building area
Mixed Beverage Permit (MB): $2,650–$5,300 per two-year period; $5,300 original, $2,650 renewal
Which offices issue these permits in Pasadena?
Permits for a restaurant in Pasadena, TX come from 6 separate offices: City of Pasadena Permit Department, City of Pasadena Public Health Department, City of Pasadena Fire Marshal's Office, Texas Alcoholic Beverage Commission, Texas Secretary of State, Texas Comptroller of Public Accounts. No single office issues them all, which is why an opening means filing in several places rather than one.
Is anything about these requirements changing?
Twenty cents a square foot, computed on the accumulative aggregate of every floor's area covered by roof or similar structure, with a $100 floor — the same rate for new construction, additions, alterations and repairs. There is a $10 application fee on every permit regardless of discipline, and no permit is less than $50 including the application. Starting work before the permit issues stops the job: the property goes on hold until double the normal fee plus a $25 administrative fee is paid and a proper permit is issued.
Non-refundable, capped at $2,000, and it gates the queue: the ordinance states no routing or plan review takes place until the fee is paid. Two sets of plans are required, complete with topography, landscape, boundary survey, drainage, electrical, plumbing, ADA compliance, IECC compliance and heating and air conditioning — an unusually specific list, and worth reading before the first submittal rather than after the first rejection.
$150, and the ordinance is blunt about the consequence of skipping it: it is unlawful to change the use or occupancy of an existing commercial property before the certificate issues, and utilities — electrical, gas and water — are not released until the Building Official or Permit Department approves. Four departments have to sign it off: building, fire marshal, health and traffic, plus planning. Where the new occupant does not change the use group classification, existing off-street parking is deemed adequate, which is the single most useful sentence in Pasadena's code for anyone taking over a like-for-like space.
$50 on a commercial project, added to the permit and plan review fees rather than charged separately — a third of the $150 charged where the certificate is sought on its own for an existing space. One- and two-family projects are $20.
$50, issued only at the written request of the owner, applicant or general contractor. The letter of completion is the no-occupancy version of the same document. Notably cheap against Waco's $200 and Arlington's $150 for the equivalent.
$50 for utilities released to clean, show or otherwise prepare a commercial space without occupying it, granted only after an inspector has visited and approved. Good for a maximum of 90 days and renewable at the same price for each further 90 days or part of one, on a fresh written request. This is the charge a landlord marketing a vacant unit meets, not the incoming tenant.
$50 per structure plus the standard $10 application, for overlay or replacement in like materials with minor decking and structural work. A permit is required once repairs exceed 25% of each roof. Where the roof is being altered or structurally modified the arithmetic changes sharply: engineered drawings are required, plan review is $50 and the building permit itself will not be less than $250. Wood shingle, shake and other combustible roofing is prohibited outright except for minor repairs to existing single-family homes.
$100 for a commercial demolition, $50 residential, and the permit is good for 30 days only or for the duration of the remodel it belongs to. Where the demolition is included with a building permit it is charged at half the normal rate and may run concurrently with that permit — which is the cheaper and faster route on a gut fit-out.
$100 for a Class 1 commercial exhaust hood — the grease-bearing type over a cooking line — and $50 for a Class 2. Commercial ventilation is $40 per fan. Where a full commercial heating or air conditioning system goes in, that is $60 each plus $5 a ton, with commercial condenser and air handler replacements at the same rate; a refrigeration permit is $40 plus $3 a ton and a boiler operating permit $75.
$50 for a commercial meter loop and service up to 400 amps, $100 from 400 to 800 amps and $200 above 800 amps, plus $10 on the application and a $40 minimum. Individual items are charged on top: outlets and lighting fixtures at $0.50 each, commercial appliances at $7 each, electric heat at $1 per kW, an X-ray machine at $25 and CT or MRI equipment at $50 — the last two being why a veterinary or medical fit-out costs more here than the floor area suggests. A permanent commercial generator is $175 and is only allowed after electrical inspector review.
$40 per circuit for incandescent and fluorescent signs, $75 per circuit for neon, and a $50 shop inspection for each sign fabricated in the jurisdiction. Festoon lighting and streamers are $10 per circuit and decorative structures $50. The code adds a condition rather than a fee: these installations must not strobe, chase, flash or spin, or otherwise interfere with traffic or amount to a public nuisance.
A $60 minimum covers asphalt patching, potholes, and curb and concrete repair. The trap is the threshold: repairs or improvements at or over 50% of the existing area force the whole lot up to current off-street paving, parking and drainage requirements — landscaping and parking count at existing business locations excepted. Splitting a resurfacing into phases to stay under the line is a decision worth making deliberately rather than discovering.
$260 low risk, $360 medium, $460 high, with the risk category set by health department staff rather than declared by the applicant. The permit is non-transferable and non-refundable, and it remains the property of the City of Pasadena Health Department — it is revoked, not surrendered, if the establishment stops complying. Sec. 15-22 makes it unlawful to construct, operate or maintain a food establishment in the city without one, so the offence covers building the kitchen as well as running it. A late renewal adds $100.
$52 for 1 to 14 days, non-transferable and non-refundable — the same figure the Texas DSHS standard schedule uses, and the same as Arlington and Waco charge, which makes temporary food one of the few genuinely uniform fees in the state. The application restricts the permit to the foods listed on it, prohibits anything prepared in a home kitchen, and requires all food to be prepared on site or at an approved food service facility.
Required for any collection, transportation or disposal of hauled liquid waste inside the Pasadena city limits — which is how a restaurant's grease trap is actually pumped out, so the obligation falls on the hauler the restaurant hires rather than on the restaurant. No city permit will be issued unless the transporter is already permitted by and registered with the Texas Commission on Environmental Quality. A vehicle and trailer identification list is filed with the application. The city publishes no fee for it.
$250 for an occupant load of 1 to 99, $350 for 99 to 299, and $500 for 300 or more — an annual, recurring cost that catches every restaurant, bar, gym and event space in the city. Most Texas cities inspect assembly occupancies without charging a standing permit fee, so this is a real difference in the cost of operating in Pasadena rather than a paperwork difference. An occupant load evaluation, if you need the number established, is $100.
Charged by the hour, which means the bill depends on how long the inspection takes rather than on what kind of business you run. Reinspection after the initial visit and one free re-check is $150. An after-hours inspection is $375 for the first three hours and $70 for each further hour or part of one — worth comparing against closing for a morning.
$100 for the first commercial year and $50 on renewal — the renewal is genuinely half price, which is unusual. A hospital or nursing home alarm is $500 and $250 to renew; residential is $50 and $25. Plan review is separate: $200 for up to 100 initiating devices, then $200 plus $1 per device above that, with sprinkler plan review priced identically per head.
$230 up to 50,000 sq ft, $345 from 50,001 to 100,000, $675 to 500,000 and $900 above that. Miscellaneous reviews are flat: an automatic extinguishing system $200, an emergency evacuation plan $150, and access control or mag locks $150. Fire plan review runs alongside the Permit Department's own plan review rather than instead of it, so a commercial project pays both.
$125 for a tent or temporary membrane structure. The rest of Pasadena's special assembly and pyrotechnics schedule sits with it: carnivals, circuses and car shows $400, explosives use or storage $400, fireworks displays $600, pyrotechnics use or storage $300, and commercial burn operations $350. Fire extinguisher training is $150 and an emergency generator or access gate permit $125 each.
Read directly from the TABC two-year licensing fee schedule: Mixed Beverage Permit (MB) $5,300 original, $2,650 renewal, charged on a two-year cycle. A Wine and Malt Beverage Retailer's Permit (BG) is $1,900 if you do not need spirits. Note a widely-cited competitor lists $6,006 for this permit, which does not appear in the TABC schedule.
Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.
Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.
There is no fee for this permit — the Comptroller says so directly, which is worth stating because a blank fee reads as though nobody knows. It does not expire on a date, but it is not permanent either: it is valid only while you are actively engaged in business as a seller, and the Comptroller's office may cancel it on finding that you are not. Filing obligations keep it alive, so a return must be filed for every period even when there were no taxable sales or purchases to report. Apply through Comptroller eSystems and allow two to three weeks.
Sources
Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.
- Fee Schedule — building, electrical, mechanical and plumbing permit feesCity of Pasadena Permit Department · primary source · retrieved 2026-08-24
- Food Establishment Permit Application, revised January 2026City of Pasadena Public Health Department · primary source · retrieved 2026-08-24
- Temporary Food Establishment Permit Application, revised January 2026City of Pasadena Public Health Department · primary source · retrieved 2026-08-24
- Miscellaneous Health PermitsCity of Pasadena Public Health Department · primary source · retrieved 2026-08-24
- Fee Schedule — Sec. 13-12 Fire and Life Safety Operating Permit, Special Use Permits, and Inspections FeesCity of Pasadena Fire Marshal's Office · primary source · retrieved 2026-08-24
- Two-Year Licensing Fees — TABCTexas Alcoholic Beverage Commission · primary source · retrieved 2026-08-22
- Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
- Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22
- Sales and Use Tax Permit — Texas ComptrollerTexas Comptroller of Public Accounts · primary source · retrieved 2026-08-20
Related
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.