What permits do you need to open a contractor or trade in Eagle Pass?

In short

A contractor or trade in Eagle Pass, TX has 3 permits that apply to every business of this type, plus 4 more that depend on your premises, signage or how you are set up. City of Eagle Pass Planning Department charges $50 per certificate for the certificate of occupancy. 2 of the 7 are charged as a range or formula rather than a flat fee. Verified 2026-08-25 against the issuing agencies’ published fee schedules.

The permits at a glance

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Certificate of OccupancyCity of Eagle Pass Planning Department$50 per certificatenot stated in the published documents2026-08-25
Commercial Building PermitCity of Eagle Pass Planning Department$30 base permit fee plus $2.00 per $1,000 of value for non-residential buildings, valued from ICC Building Valuation Data; plan check $193 for new commercial and industrial or $88 for additions and renovations; projects over $1,000,000 valuation add 1% of the building feeapplication lapses 180 days after filing; permit lapses if work is not commenced within 180 days2026-08-25
Demolition Permitonly if it applies to youCity of Eagle Pass Planning Department$98 per structureper permit2026-08-25
Contractor RegistrationCity of Eagle Pass Planning Department$65–$100 initial, then annual renewal1 year, running 1 January to 31 December2026-08-25
Certificate of Formationonly if it applies to youTexas Secretary of State$300 one-time filingno expiry2026-08-20
Electrical Contractor Licenceonly if it applies to youTexas Department of Licensing and Regulation$110 non-refundable applicationannual2026-08-20
Assumed Name Certificate (DBA)only if it applies to youTexas Secretary of State$25 one-time filingup to ten years, renewable2026-08-21

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

How much does it actually cost to permit a contractor or trade in Eagle Pass?

There is no single figure, and any site quoting one is rounding away the part that matters. Of the 7 records listed for a contractor or trade in Eagle Pass, TX, 3 apply to every business of this type and 4 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.

Of the 3 that always apply, 1 carry a flat fee, coming to $50.00. That is a floor, not a total. 2 of the 7 are charged as a range or a formula set by the issuing agency, and 0 have no fee published at all. The ones that vary:

Commercial Building Permit: $30 base permit fee plus $2.00 per $1,000 of value for non-residential buildings, valued from ICC Building Valuation Data; plan check $193 for new commercial and industrial or $88 for additions and renovations; projects over $1,000,000 valuation add 1% of the building fee

Contractor Registration: $65–$100 initial, then annual renewal

Which offices issue these permits in Eagle Pass?

Permits for a contractor or trade in Eagle Pass, TX come from 3 separate offices: City of Eagle Pass Planning Department, Texas Secretary of State, Texas Department of Licensing and Regulation. No single office issues them all, which is why an opening means filing in several places rather than one.

Is anything about these requirements changing?

$50, and the city runs a separate application for occupancy or use that does NOT require a building permit — which is the form a tenant taking on finished premises needs. The ordinance reaches further than most: Appendix A section 18 says no vacant LAND may be occupied or used except for agricultural purposes until a certificate has issued, so an outdoor use such as a car lot or a storage yard needs one even with no building involved.

Two dollars per thousand of value is among the lowest construction rates in this dataset — a $250,000 fit-out is about $530 including the base fee, against roughly $6,450 in Mansfield for the same job. The value is taken from ICC Building Valuation Data rather than from what you declare. Two additions are easy to miss: a park dedication charge of $1.00 per $1,000 of value on top, and a further 1 per cent of the building fee once valuation passes $1m. Building without a permit doubles the fee with a $200 floor. Note the lapse rules — the application dies 180 days after filing, and the permit dies if work has not started within 180 days of issue.

$98 per structure, and the form is explicit that an asbestos survey is required for all work except a single-family residence — so a commercial demolition carries a survey cost that is not on the fee table and will usually exceed the permit. Fill and grade work is $193, and a right-of-way curb cut $50.

$100 for the initial annual registration and $65 to renew each year thereafter, on proof of continued compliance. The amount is set by section 8-54 of the code; the city's registration form names the nine trades that must register — master plumber, mechanical contractor, electrical contractor, apprentice, journeyman and master electrician, general contractor, sign contractor, demolition contractor and swimming pool contractor — but carries no figure, which is why this was previously recorded as an obligation without an amount. The fiscal year runs 1 January to 31 December whatever month you register, and a new registration taken out after 1 July costs half. Renewals are never prorated, so registering in October buys three months at half price and then a full year.

Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.

Texas licenses no general contractor - there is no statewide builder licence. Individual trades are licensed instead: electrical, plumbing and HVAC, each under its own programme. The $110 is the application fee. Published renewal figures conflict between $110 and $165 depending on licence subtype, so no renewal amount is recorded until a reviewer confirms which applies.

Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.

Sources

Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.

  1. City of Eagle Pass Commercial and Industrial Building Permit Application, revision 06/2025, including the Office Use Only fee tableCity of Eagle Pass Planning Department · primary source · retrieved 2026-08-25
  2. City of Eagle Pass Code of Ordinances Chapter 8, Article IV, section 8-54, contractor certificate of registration feesCity of Eagle Pass · primary source · retrieved 2026-08-25
  3. City of Eagle Pass Contractor Registration ApplicationCity of Eagle Pass Planning Department · primary source · retrieved 2026-08-25
  4. Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
  5. Apply for a New Electrical Contractor License - TDLRTexas Department of Licensing and Regulation · primary source · retrieved 2026-08-22
  6. Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22