The Colony
City of The Colony Fire Marshal
In short
City of The Colony Fire Marshal issues 3 permits we publish for The Colony, last verified 2026-08-25. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.
What this agency issues
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Fire Sprinkler Permitonly if it applies to you | City of The Colony Fire Marshal | $175–$300 per system, by sprinkler head count | per permit | 2026-08-25 |
| Vent Hood Permit | City of The Colony Fire Marshal | $50–$100 first hood, then each additional | per permit | 2026-08-25 |
| Fire Alarm Permitonly if it applies to you | City of The Colony Fire Marshal | $150–$350 per system, by signal initiating device count | per permit | 2026-08-25 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
About each permit
Fire Sprinkler Permit
$175 for 1 to 100 heads, $200 to 200, $225 to 300, $250 to 400, $300 to 500, and above 500 heads $250 plus $0.25 for each head over 500 — which means a very large system can cost less than a 500-head one, an oddity worth checking with the fire marshal rather than assuming. A fire line permit is $225 and a storage tank $100 above ground or $150 below.
Vent Hood Permit
$100 for the first hood and $50 for each additional one, so a kitchen with a range hood and a separate fryer hood pays $150. A CO2 system — the sort a bar or a soft drink dispenser uses — is $100, and special locks $100. Working without a fire permit doubles the fee.
Fire Alarm Permit
Banded on signal initiating devices: $150 for 1 to 25, $200 to 50, $250 to 75, $325 to 100, then $350 plus $0.75 for each device over 100. Replacing only the fire panel is $100, and only the communicator $100. Fire plan review is $175 and a re-submittal $200 — more than the review itself, which is an unusual incentive to get the first submission right. An emergency radio responder coverage system is $150.
Contact
- Jurisdiction
- The Colony
- Phone
- Not verified — use the website
- Website
- www.thecolonytx.gov/
Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.
Sources
Every fee and term above was read from one of these government pages on the date shown.
- City of The Colony Master Fee Schedule, 1 October 2025 to 30 September 2026City of The Colony · primary source · retrieved 2026-08-25
Other offices serving The Colony
The full permit list for this jurisdiction
Industry permit lists that include this agency
Texas jurisdictions
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.
