9 permits · verified 2026-08-25
What permits do you need to open a salon or barber in Irving?
In short
A salon or barber in Irving, TX has 6 permits that apply to every business of this type, plus 3 more that depend on your premises, signage or how you are set up. City of Irving Inspections Department charges $52 per permit for the single trade permit. 4 of the 9 are charged as a range or formula rather than a flat fee. Verified 2026-08-25 against the issuing agencies’ published fee schedules.
The permits at a glance
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Commercial Building Permit | City of Irving Inspections Department | Banded on building area: $965 up to 2,500 sq ft; $260 + $0.28/sq ft to 10,000; $645 + $0.25/sq ft to 50,000; $1,940 + $0.22/sq ft to 100,000; $3,220 + $0.21/sq ft to 300,000; $7,110 + $0.20/sq ft above. Plan review is a further 25% of the permit fee | per permit | 2026-08-25 |
| Contractor Registration | City of Irving Inspections Department | $0–$125 per year, per trade | 1 year from the date of issue | 2026-08-25 |
| Certificate of Occupancy | City of Irving Inspections Department | $31–$190 per certificate, by use | not stated in the published schedule | 2026-08-25 |
| Interior Finish, Repair and Remodel Permit | City of Irving Inspections Department | 50% of the commercial building permit fee for the same area; a shell building is 80% | per permit | 2026-08-25 |
| Single Trade Permitonly if it applies to you | City of Irving Inspections Department | $52 per permit | per permit | 2026-08-25 |
| Barbering and Cosmetology Establishment Licence | Texas Department of Licensing and Regulation | $78 per licence period | two years | 2026-08-21 |
| Certificate of Formationonly if it applies to you | Texas Secretary of State | $300 one-time filing | no expiry | 2026-08-20 |
| Assumed Name Certificate (DBA)only if it applies to you | Texas Secretary of State | $25 one-time filing | up to ten years, renewable | 2026-08-21 |
| Texas Sales and Use Tax Permit | Texas Comptroller of Public Accounts | No fee — there is no fee for this permit | no expiry while actively engaged in business | 2026-08-21 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
How much does it actually cost to permit a salon or barber in Irving?
There is no single figure, and any site quoting one is rounding away the part that matters. Of the 9 records listed for a salon or barber in Irving, TX, 6 apply to every business of this type and 3 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.
Of the 6 that always apply, 2 carry a flat fee, coming to $78.00. That is a floor, not a total. 4 of the 9 are charged as a range or a formula set by the issuing agency, and 0 have no fee published at all. The ones that vary:
Commercial Building Permit: Banded on building area: $965 up to 2,500 sq ft; $260 + $0.28/sq ft to 10,000; $645 + $0.25/sq ft to 50,000; $1,940 + $0.22/sq ft to 100,000; $3,220 + $0.21/sq ft to 300,000; $7,110 + $0.20/sq ft above. Plan review is a further 25% of the permit fee
Contractor Registration: $0–$125 per year, per trade
Certificate of Occupancy: $31–$190 per certificate, by use
Interior Finish, Repair and Remodel Permit: 50% of the commercial building permit fee for the same area; a shell building is 80%
Which offices issue these permits in Irving?
Permits for a salon or barber in Irving, TX come from 4 separate offices: City of Irving Inspections Department, Texas Department of Licensing and Regulation, Texas Secretary of State, Texas Comptroller of Public Accounts. No single office issues them all, which is why an opening means filing in several places rather than one.
Is anything about these requirements changing?
Watch the first band: up to 2,500 square feet is a flat $965, but 2,501 square feet drops to $260 plus $0.28 a foot — about $960 — and only passes $965 again at around 2,520 feet. Measure before submitting. The permit is a COMBINATION permit covering building, electrical, plumbing and mechanical together, and the general contractor pulls it; registered subcontractors do not buy separate permits under it. The certificate of occupancy is included in this fee. Separate permits are still needed for drive approaches, fences, signs, fire sprinklers, fire alarms, fire mains and hydrants, on-site utilities, irrigation, retaining walls, construction trailers, pools, fuel tanks, electric door locks, gate controllers and solar. Starting work without a permit adds 100 per cent of the fee.
$125 a year each for electrical, mechanical, general, concrete or masonry, fuel tank, irrigation, house-moving and apartment maintenance registration. Plumbing is $0, and the schedule states that plumbing, fire sprinkler and fire alarm contractors are exempt from registration fees by state law. The code makes it unlawful for an unregistered contractor to take out a permit at all, with one carve-out: a homeowner may permit work at a residence they live in and hold a homestead exemption on. A fuel tank installer is a registered trade in its own right, which matters for an auto repair or fuel retail site.
Priced by what the business is rather than by floor area — the only schedule in this dataset that does. A restaurant is $190, an auto-related use $140, a day care $140, and everything else $105. A change of name or a duplicate certificate is $31, which is worth knowing when a business rebrands without moving or altering anything. Note that the certificate is included in the price of a new commercial building permit and of an interior finish permit, so it is charged separately only when there is no construction.
Half the new-construction rate, and the certificate of occupancy is included where one is required — so a 5,000 square foot fit-out is roughly $830 with the certificate rolled in, against $1,660 to build the same area new. A shell building is 80 per cent. Plan review at 25 per cent applies to an interior finish over 2,500 square feet, and revisions after that are charged by time at $44 an hour with a one-hour minimum. A foundation-only permit adds 10 per cent of the regular fee on top.
$52 flat for a single electrical, plumbing, mechanical or building trade permit — service changes, water heaters, gas or sewer line replacements, air conditioning replacement, clean-and-shows, flatwork, demolition of a single-family structure, tents over 400 square feet, canopies over 1,600 square feet and telecommunication antennae all sit at the same price. Re-roofing is $100 commercial. Foundation repair is $125 per building. Reinspection is $75 and an after-hours inspection $44 an hour on a two-hour minimum.
Establishment licences are valid for two years from the date of issue, so the $78 is a two-year cost rather than an annual one — worth halving before you compare it with a yearly permit elsewhere. The fee applies to standard and specialty establishments; a mini-establishment licence is $70. It covers full-service, mobile and specialty establishments, and applies to licences expiring on or after 1 September 2023. Individual practitioners are licensed separately from the establishment, so a salon needs both its own licence and a licence for each operator working in it.
Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.
Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.
There is no fee for this permit — the Comptroller says so directly, which is worth stating because a blank fee reads as though nobody knows. It does not expire on a date, but it is not permanent either: it is valid only while you are actively engaged in business as a seller, and the Comptroller's office may cancel it on finding that you are not. Filing obligations keep it alive, so a return must be filed for every period even when there were no taxable sales or purchases to report. Apply through Comptroller eSystems and allow two to three weeks.
Sources
Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.
- City of Irving Land Development Code, Part I, chapter 8B, section 8B-3, Permit feesCity of Irving · primary source · retrieved 2026-08-25
- Barbering and Cosmetology Fee Changes — TDLRTexas Department of Licensing and Regulation · primary source · retrieved 2026-08-22
- Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
- Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22
- Sales and Use Tax Permit — Texas ComptrollerTexas Comptroller of Public Accounts · primary source · retrieved 2026-08-20
Related
- All permits in Irving
- Salons and barbers — national overview
- Salons and barbers in Fort Worth, TX
- Salons and barbers in Grand Prairie, TX
- Salons and barbers in Arlington, TX
- Salons and barbers in San Antonio, TX
- Salons and barbers in Pasadena, TX
- Auto repair shops in Irving
- Childcare centres in Irving
- Coffee shops in Irving
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.
