In short

Brazoria County Engineering issues 1 permit we publish for Brazoria County, last verified 2026-10-19. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Permit to Work in County Right of Wayonly if it applies to youBrazoria County Engineering$100 for each fee-bearing permit type (landscaping, petroleum pipeline, surveying, geotechnical investigation, road connection, work in right of way, other); traffic control plan fee $100; plan review fee $400 when applicable.per project; work must begin within 60 days of the permit or a new permit is required2026-10-19

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

Permit to Work in County Right of Way

A contractor working in, under, across or along a Brazoria County road right of way needs a permit from the County Engineer before starting. The county's procedures state that "permits issued by cities or other agencies are not acceptable for work performed in a Brazoria County Right of Way". The current application form (Version: 10/7/2026), linked from the Engineering Permits page, marks a $100 fee for each of landscaping, petroleum pipeline, surveying, geotechnical investigation, road connection, work in right of way and other work, plus a $100 traffic control plan fee and a $400 plan review fee when applicable, all payable before the permit is issued. Approval may take up to two weeks after a complete application, open-cut crossings of county roads are not allowed, and work must begin within 60 days. Contact Engineering at 979-864-1265.

Contact

Jurisdiction
Brazoria County
Phone
979-864-1265

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. Application for Work in Brazoria County Right of Way (Version: 10/7/2026)Brazoria County Engineering · primary source · retrieved 2026-10-19
  2. Engineering PermitsBrazoria County Engineering · primary source · retrieved 2026-10-19
  3. Procedures to be Followed for Activity in, under, across or along Brazoria County Roads, Streets, HighwaysBrazoria County Engineering · primary source · retrieved 2026-10-19

Other offices serving Brazoria County

The full permit list for this jurisdiction

Industry permit lists that include this agency

Texas jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.