What permits do you need to open a salon or barber in Odessa?

In short

A salon or barber in Odessa, TX has 7 permits that apply to every business of this type, plus 4 more that depend on your premises, signage or how you are set up. City of Odessa Inspection Division charges $100 change of use, owner or name for the certificate of occupancy. 6 of the 11 are charged as a range or formula rather than a flat fee. Verified 2026-08-25 against the issuing agencies’ published fee schedules.

The permits at a glance

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Commercial Plumbing PermitCity of Odessa Inspection Division$50 base plus $0.05 per square foot for complete plumbing, or $0.025 for finish-out or rough-in onlynot stated in the published fee scheduleRe-check due
False Alarm Feeonly if it applies to youOdessa Fire Marshal's Office$300–$500 per call, after the thirdcounted 1 January to 31 DecemberRe-check due
Commercial Electrical PermitCity of Odessa Inspection Division$50 base plus $0.05 per square foot for complete electrical; a new or replacement service is $30 plus $0.10 per square footnot stated in the published fee scheduleRe-check due
Re-inspection Feeonly if it applies to youCity of Odessa Inspection Division$50–$100 escalating by attemptper inspectionRe-check due
Commercial Building PermitCity of Odessa Inspection Division$1,000 plus $0.12 per square footnot stated in the published fee scheduleRe-check due
Commercial Remodel and Finish-Out PermitCity of Odessa Inspection Division$50 plus $0.10 per square footnot stated in the published fee scheduleRe-check due
Certificate of OccupancyCity of Odessa Inspection Division$100 change of use, owner or namedoes not expire; a change of use, owner or business name requires a new certificateRe-check due
Barbering and Cosmetology Establishment LicenceTexas Department of Licensing and Regulation$78 per licence periodtwo years2026-08-21
Certificate of Formationonly if it applies to youTexas Secretary of State$300 one-time filingno expiry2026-08-20
Assumed Name Certificate (DBA)only if it applies to youTexas Secretary of State$25 one-time filingup to ten years, renewable2026-08-21
Texas Sales and Use Tax PermitTexas Comptroller of Public AccountsNo fee — there is no fee for this permitno expiry while actively engaged in business2026-08-21

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

How much does it actually cost to permit a salon or barber in Odessa?

There is no single figure, and any site quoting one is rounding away the part that matters. Of the 11 records listed for a salon or barber in Odessa, TX, 7 apply to every business of this type and 4 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.

Of the 7 that always apply, 3 carry a flat fee, coming to $178.00. That is a floor, not a total. 6 of the 11 are charged as a range or a formula set by the issuing agency, and 0 have no fee published at all. The ones that vary:

Commercial Plumbing Permit: $50 base plus $0.05 per square foot for complete plumbing, or $0.025 for finish-out or rough-in only

False Alarm Fee: $300–$500 per call, after the third

Commercial Electrical Permit: $50 base plus $0.05 per square foot for complete electrical; a new or replacement service is $30 plus $0.10 per square foot

Re-inspection Fee: $50–$100 escalating by attempt

Commercial Building Permit: $1,000 plus $0.12 per square foot

Commercial Remodel and Finish-Out Permit: $50 plus $0.10 per square foot

Which offices issue these permits in Odessa?

Permits for a salon or barber in Odessa, TX come from 5 separate offices: City of Odessa Inspection Division, Odessa Fire Marshal's Office, Texas Department of Licensing and Regulation, Texas Secretary of State, Texas Comptroller of Public Accounts. No single office issues them all, which is why an opening means filing in several places rather than one.

Is anything about these requirements changing?

$50 plus five cents a square foot for complete plumbing, halving to $0.025 where the work is finish-out or rough-in only. An irrigation permit, a swimming pool permit and a water well permit are $50 each. Electrical and mechanical follow the same $50-plus-per-square-foot pattern, with mechanical adding $10 per unit.

The first three false alarms in a calendar year are free. The fourth to seventh are $300 EACH and the eighth onwards $500 each — so a business with a faulty panel can run up $2,200 before it reaches its eighth call. The count resets on 1 January. Odessa's escalation is far steeper than Abilene's, which charges $50, $75 and $100 at the same thresholds.

$50 base, then five cents a square foot complete or $0.025 for finish-out or rough-in only. A new or replacement service is $30 plus ten cents a square foot, a temporary power pole $50, and moving or altering a service $50. Solar panel installation is priced by amperage at $0.10 per amp. Light poles are $50 plus $7.50 each for the first ten and $5 each thereafter.

$50 for the first and second re-inspection, $75 for the third and fourth, and $100 for the fifth and above — an escalation that mirrors Waco's. Releasing a stop work order is $100, at the inspector's discretion, and any miscellaneous permit is $50.

A $1,000 base plus twelve cents a square foot — the highest fixed base of any city in this dataset, against $200 minimums in Killeen and Mesquite and $100 in San Antonio. On a small commercial building that base dominates: a 3,000 sq ft unit computes to $1,360, where Killeen would charge $600. Plan review is 25% of the permit fee, applied at pick-up. Additions, remodels and finish-outs are cheaper at $50 plus $0.10 a square foot. Confirm before budgeting — this schedule is dated January 2018.

$50 plus ten cents a square foot for additions, remodels and finish-outs — an order of magnitude below the $1,000 base on new construction, so Odessa strongly favours reusing an existing shell. A 2,000 sq ft restaurant fit-out is $250 in building permit before the trades. Plan review is 25% of the permit fee.

$100 on a change of use, change of owner OR change of business name — Odessa's trigger list is as broad as Waco's, so a rebrand alone requires a new certificate. Re-issuing one is $15. A temporary certificate of occupancy is $50 with a $25 extension, which is the cheapest temporary certificate in this dataset by a wide margin: Fort Worth charges $378 and San Antonio $500.

Establishment licences are valid for two years from the date of issue, so the $78 is a two-year cost rather than an annual one — worth halving before you compare it with a yearly permit elsewhere. The fee applies to standard and specialty establishments; a mini-establishment licence is $70. It covers full-service, mobile and specialty establishments, and applies to licences expiring on or after 1 September 2023. Individual practitioners are licensed separately from the establishment, so a salon needs both its own licence and a licence for each operator working in it.

Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.

Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.

There is no fee for this permit — the Comptroller says so directly, which is worth stating because a blank fee reads as though nobody knows. It does not expire on a date, but it is not permanent either: it is valid only while you are actively engaged in business as a seller, and the Comptroller's office may cancel it on finding that you are not. Filing obligations keep it alive, so a return must be filed for every period even when there were no taxable sales or purchases to report. Apply through Comptroller eSystems and allow two to three weeks.

Sources

Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.

  1. Master Permit Fee Schedule, 16 January 2018City of Odessa Inspection Division · primary source · retrieved 2026-08-24
  2. Fire Marshal Fee Schedule (2021 International Fire Code)Odessa Fire Marshal's Office · primary source · retrieved 2026-08-24
  3. Barbering and Cosmetology Fee Changes — TDLRTexas Department of Licensing and Regulation · primary source · retrieved 2026-08-22
  4. Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
  5. Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22
  6. Sales and Use Tax Permit — Texas ComptrollerTexas Comptroller of Public Accounts · primary source · retrieved 2026-08-20

Related

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.