What permits do you need to open a contractor or trade in Mcallen?

In short

A contractor or trade in Mcallen, TX has 4 permits that apply to every business of this type, plus 5 more that depend on your premises, signage or how you are set up. City of McAllen Building Permits & Inspections Department charges $48 per permit, all types for the permit renewal fee. 4 of the 9 are charged as a range or formula rather than a flat fee. Verified 2026-08-25 against the issuing agencies’ published fee schedules.

The permits at a glance

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Permit Renewal Feeonly if it applies to youCity of McAllen Building Permits & Inspections Department$48 per permit, all typesnot stated in the published fee scheduleRe-check due
Commercial Building PermitCity of McAllen Building Permits & Inspections Department$48 minimum for 0-300 sq ft; $0.16 per square foot at 301 sq ft or morenot stated in the published fee scheduleRe-check due
Commercial Plan Review FeeCity of McAllen Building Permits & Inspections Department18% of the building permit feeone-time, per applicationRe-check due
Commercial Electrical PermitCity of McAllen Building Permits & Inspections Department$15.60 base fee, plus $2.40 per circuit or feedernot stated in the published fee scheduleRe-check due
Commercial Plumbing PermitCity of McAllen Building Permits & Inspections Department$39.60 base fee, plus $4.80 per fixture, floor drain or trapnot stated in the published fee scheduleRe-check due
Commercial Demolition Permitonly if it applies to youCity of McAllen Building Permits & Inspections Department$79.80 per permitnot stated in the published fee scheduleRe-check due
Certificate of Formationonly if it applies to youTexas Secretary of State$300 one-time filingno expiry2026-08-20
Electrical Contractor Licenceonly if it applies to youTexas Department of Licensing and Regulation$110 non-refundable applicationannual2026-08-20
Assumed Name Certificate (DBA)only if it applies to youTexas Secretary of State$25 one-time filingup to ten years, renewable2026-08-21

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

How much does it actually cost to permit a contractor or trade in Mcallen?

There is no single figure, and any site quoting one is rounding away the part that matters. Of the 9 records listed for a contractor or trade in Mcallen, TX, 4 apply to every business of this type and 5 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.

4 of the 9 are charged as a range or a formula set by the issuing agency, and 0 have no fee published at all. The ones that vary:

Commercial Building Permit: $48 minimum for 0-300 sq ft; $0.16 per square foot at 301 sq ft or more

Commercial Plan Review Fee: 18% of the building permit fee

Commercial Electrical Permit: $15.60 base fee, plus $2.40 per circuit or feeder

Commercial Plumbing Permit: $39.60 base fee, plus $4.80 per fixture, floor drain or trap

Which offices issue these permits in Mcallen?

Permits for a contractor or trade in Mcallen, TX come from 3 separate offices: City of McAllen Building Permits & Inspections Department, Texas Secretary of State, Texas Department of Licensing and Regulation. No single office issues them all, which is why an opening means filing in several places rather than one.

Is anything about these requirements changing?

$48 to renew any permit type, and the same $48 to take over a permit from another contractor — Waco charges 50% of the original permit fee to renew, so a large McAllen project renews far more cheaply. Re-inspections are also $48 each.

$0.16 a square foot above 300 sq ft, with a $48 minimum, and the same rate applies across occupancy groups A, B, E, F, H, I, M, S and U as well as the residential groups. That is the lowest commercial building permit rate in this dataset by a wide margin — roughly half Grand Prairie's $0.28 and Waco's $0.28 — which is the strongest reason to confirm it before relying on it, because the schedule is dated 2016. A park development fee of $700 per unit applies where relevant.

18% of the building permit fee, commercial only — the lowest plan review rate in this dataset, against 45% in Grand Prairie, 35% in Arlington and 25% in both Waco and Abilene.

$15.60 base, $15.60 for a service, service re-do or temporary pole, and $2.40 for each circuit or feeder. A rewire is $39.60 and working clearance $39.60 per meter — the latter may also require a deposit of between $500 and $5,000, which is much the largest number on McAllen's schedule and easy to miss.

$39.60 base plus $4.80 a fixture, floor drain or trap. A new sewer is $15.60, a replaced or repaired sewer $15.60, a water heater $24.00, a new or repaired gas line $15.60, and repair or alteration of drainage or vent piping $39.60. Eliminating a septic system or a grease trap — a sewer plug — is $39.60 each. A lawn or landscape sprinkler system is $24.00 plus $4.00 for the backflow device.

$79.80 commercial against $39.60 residential. Moving a structure is $159.60 — the largest single flat fee on McAllen's schedule.

Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.

Texas licenses no general contractor - there is no statewide builder licence. Individual trades are licensed instead: electrical, plumbing and HVAC, each under its own programme. The $110 is the application fee. Published renewal figures conflict between $110 and $165 depending on licence subtype, so no renewal amount is recorded until a reviewer confirms which applies.

Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.

Sources

Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.

  1. Permit fee schedule — effective 1 October 2016, page footer updated November 2019City of McAllen Building Permits & Inspection Department · primary source · retrieved 2026-08-24
  2. Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
  3. Apply for a New Electrical Contractor License - TDLRTexas Department of Licensing and Regulation · primary source · retrieved 2026-08-22
  4. Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22

Related