14 permits · verified 2026-08-24
What permits do you need to open a contractor or trade in Killeen?
In short
A contractor or trade in Killeen, TX has 4 permits that apply to every business of this type, plus 10 more that depend on your premises, signage or how you are set up. City of Killeen Development Services charges $100 per structure for the commercial demolition permit. 5 of the 14 are charged as a range or formula rather than a flat fee. Verified 2026-08-24 against the issuing agencies’ published fee schedules.
The permits at a glance
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Commercial Demolition Permitonly if it applies to you | City of Killeen Development Services | $100 per structure | not stated in the published fee schedule | 2026-08-24 |
| Commercial Landscape Permitonly if it applies to you | City of Killeen Development Services | $220 per permit | not stated in the published fee schedule | 2026-08-24 |
| Commercial Building Permit | City of Killeen Development Services | $0.20 per square foot, minimum $200 | not stated in the published fee schedule | 2026-08-24 |
| Commercial Trade Permit | City of Killeen Development Services | $50–$90 per unit, by trade | not stated in the published fee schedule | 2026-08-24 |
| Construction Registration | City of Killeen Development Services | $80 per year | one year | 2026-08-24 |
| Flood Plain Permitonly if it applies to you | City of Killeen Development Services | $300 per permit | not stated in the published fee schedule | 2026-08-24 |
| Lawn Irrigation Permitonly if it applies to you | City of Killeen Development Services | $75 per permit | not stated in the published fee schedule | 2026-08-24 |
| Re-Roof Permitonly if it applies to you | City of Killeen Development Services | $0.03 per square foot, minimum $50 | not stated in the published fee schedule | 2026-08-24 |
| Solar Panel Permitonly if it applies to you | City of Killeen Development Services | $100 base fee plus $5 per panel, with plan review at $335 | not stated in the published fee schedule | 2026-08-24 |
| After Hours Inspectiononly if it applies to you | City of Killeen Development Services | $200 for the first two hours, then $145 per hour or fraction of an hour | per inspection | 2026-08-24 |
| Billboard Permit | City of Killeen Development Services | $375 per permit | annual registration of $60 per sign thereafter | 2026-08-24 |
| Certificate of Formationonly if it applies to you | Texas Secretary of State | $300 one-time filing | no expiry | 2026-08-20 |
| Electrical Contractor Licenceonly if it applies to you | Texas Department of Licensing and Regulation | $110 non-refundable application | annual | 2026-08-20 |
| Assumed Name Certificate (DBA)only if it applies to you | Texas Secretary of State | $25 one-time filing | up to ten years, renewable | 2026-08-21 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
How much does it actually cost to permit a contractor or trade in Killeen?
There is no single figure, and any site quoting one is rounding away the part that matters. Of the 14 records listed for a contractor or trade in Killeen, TX, 4 apply to every business of this type and 10 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.
Of the 4 that always apply, 2 carry a flat fee, coming to $455.00. That is a floor, not a total. 5 of the 14 are charged as a range or a formula set by the issuing agency, and 0 have no fee published at all. The ones that vary:
Commercial Building Permit: $0.20 per square foot, minimum $200
Commercial Trade Permit: $50–$90 per unit, by trade
Re-Roof Permit: $0.03 per square foot, minimum $50
Solar Panel Permit: $100 base fee plus $5 per panel, with plan review at $335
After Hours Inspection: $200 for the first two hours, then $145 per hour or fraction of an hour
Which offices issue these permits in Killeen?
Permits for a contractor or trade in Killeen, TX come from 3 separate offices: City of Killeen Development Services, Texas Secretary of State, Texas Department of Licensing and Regulation. No single office issues them all, which is why an opening means filing in several places rather than one.
Is anything about these requirements changing?
$100 per structure commercial, against $70 residential. Flat regardless of size or height, unlike San Antonio and Abilene which band demolition by storeys.
$220 for a commercial or multi-family lot, against $120 for one and two-family. A flat fee rather than the acreage bands San Antonio and Arlington use — cheaper on a large site, dearer on a small one. Landscape is explicitly excluded from the all-in building permit, so budget it separately.
Twenty cents a square foot with a $200 floor, and the schedule is explicit about what that buys: permits for structure, electrical, mechanical, plumbing and the required inspections, all in one. It does NOT cover fences, storage buildings, accessory structures, lawn irrigation, temporary poles, landscape, whole-house water softeners, swimming pools or plan review — those are permitted and charged separately. Plan review is a further $0.04 a square foot. A $10 technology and application fee is added to most permits.
Where a trade is permitted on its own rather than inside a building permit: building $90 per unit, electrical $50, mechanical $50 and plumbing $50. Plan review is $185, and the schedule states it applies when two or more permit types are requested at the same time — so pulling three trades together costs $185 once, not three times. A partial inspection is $35 and a failed inspection of any kind is a $50 penalty.
$80 a year to register as a contractor with the city. Cheap against Pasadena's $75 initial plus $75 annual with a $300,000 insurance requirement, and against Fort Worth's $168.75. A Construction Board of Appeals request is $275.
$300 for lots other than one and two-family, which are $150. Double the residential rate and double Abilene's flat $150, though Grand Prairie charges $300 to $500 on acreage bands for the same thing.
$75, and explicitly NOT covered by the all-in building permit — the schedule names lawn irrigation in its list of exclusions, so a commercial site landscaping a new build pays this on top.
Three cents a square foot with a $50 floor. On a 20,000 sq ft commercial roof that is $600 — cheaper than Grand Prairie's 1% of work value but dearer than Abilene's flat $200 per roof structure.
$100 plus $5 a panel, and then $335 for plan review — the review costs more than the permit on any array under 47 panels. A 100-panel commercial installation comes to $935 all in.
$200 covers the first two hours and each further hour or part of one is $145 — one of the steepest hourly after-hours rates in this dataset, against Pasadena's $70 for each hour past the first three. Worth comparing against closing for a morning.
$375 for the permit and then $60 per sign every year to keep it registered — the recurring half is what operators forget. An off-premises temporary sign permit is $85 a year, with each additional sign tag in the same calendar year costing $1.
Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.
Texas licenses no general contractor - there is no statewide builder licence. Individual trades are licensed instead: electrical, plumbing and HVAC, each under its own programme. The $110 is the application fee. Published renewal figures conflict between $110 and $165 depending on licence subtype, so no renewal amount is recorded until a reviewer confirms which applies.
Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.
Sources
Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.
- Development Services permit fees — Adopted Annual Budget, effective 1 October 2025 to 30 September 2026City of Killeen · primary source · retrieved 2026-08-24
- Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
- Apply for a New Electrical Contractor License - TDLRTexas Department of Licensing and Regulation · primary source · retrieved 2026-08-22
- Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22
Related
- All permits in Killeen
- Contractors and trades — national overview
- Contractors and trades in Fort Worth, TX
- Contractors and trades in Grand Prairie, TX
- Contractors and trades in Arlington, TX
- Contractors and trades in San Antonio, TX
- Contractors and trades in Pasadena, TX
- Auto repair shops in Killeen
- Childcare centres in Killeen
- Coffee shops in Killeen
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.