Commercial Compliance Hub

7 permits · verified 2026-08-24

What permits do you need to open a childcare centre in Killeen?

In short

A childcare centre in Killeen, TX has 5 permits that apply to every business of this type, plus 2 more that depend on your premises, signage or how you are set up. City of Killeen Development Services charges $90 per issuance for the certificate of occupancy. 3 of the 7 are charged as a range or formula rather than a flat fee. Verified 2026-08-24 against the issuing agencies’ published fee schedules.

The permits at a glance

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Commercial Building PermitCity of Killeen Development Services$0.20 per square foot, minimum $200not stated in the published fee schedule2026-08-24
Commercial Remodel and Repair PermitCity of Killeen Development Services$0.24 per square foot, minimum $200not stated in the published fee schedule2026-08-24
Certificate of OccupancyCity of Killeen Development Services$90 per issuancedoes not expire; a partial or temporary certificate runs 30 days2026-08-24
Child Care LicenceTexas Health and Human Services$35 application, then an annual fee of $35 plus $1 per child of licensed capacityannual2026-08-20
Certificate of Formationonly if it applies to youTexas Secretary of State$300 one-time filingno expiry2026-08-20
Assumed Name Certificate (DBA)only if it applies to youTexas Secretary of State$25 one-time filingup to ten years, renewable2026-08-21
Texas Sales and Use Tax PermitTexas Comptroller of Public AccountsNo fee — there is no fee for this permitno expiry while actively engaged in business2026-08-21

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

How much does it actually cost to permit a childcare centre in Killeen?

There is no single figure, and any site quoting one is rounding away the part that matters. Of the 7 records listed for a childcare centre in Killeen, TX, 5 apply to every business of this type and 2 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.

Of the 5 that always apply, 2 carry a flat fee, coming to $90.00. That is a floor, not a total. 3 of the 7 are charged as a range or a formula set by the issuing agency, and 0 have no fee published at all. The ones that vary:

Commercial Building Permit: $0.20 per square foot, minimum $200

Commercial Remodel and Repair Permit: $0.24 per square foot, minimum $200

Child Care Licence: $35 application, then an annual fee of $35 plus $1 per child of licensed capacity

Which offices issue these permits in Killeen?

Permits for a childcare centre in Killeen, TX come from 4 separate offices: City of Killeen Development Services, Texas Health and Human Services, Texas Secretary of State, Texas Comptroller of Public Accounts. No single office issues them all, which is why an opening means filing in several places rather than one.

Is anything about these requirements changing?

Twenty cents a square foot with a $200 floor, and the schedule is explicit about what that buys: permits for structure, electrical, mechanical, plumbing and the required inspections, all in one. It does NOT cover fences, storage buildings, accessory structures, lawn irrigation, temporary poles, landscape, whole-house water softeners, swimming pools or plan review — those are permitted and charged separately. Plan review is a further $0.04 a square foot. A $10 technology and application fee is added to most permits.

Killeen charges MORE to remodel than to build new — $0.24 a square foot against $0.20 — which is the reverse of most Texas cities and worth knowing when comparing a fit-out against new construction. Plan review is $0.04 a square foot either way. As with new construction, the fee bundles structure, electrical, mechanical and plumbing with the inspections.

$90 for a new certificate — one of the cheapest in this dataset, against $200 in San Antonio and $100 in Arlington and Frisco. The escalation on temporary certificates is where Killeen gets expensive: $100 for the first 30 days, $200 for a second 30-day extension and $270 for a third or any subsequent one. Running three extensions costs $570 on top of the original.

Worked example: a centre licensed for 100 children pays $135 a year ($35 + $1 x 100). The annual fee falls on the anniversary of the date the initial licence was issued, not on a calendar date.

Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.

Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.

There is no fee for this permit — the Comptroller says so directly, which is worth stating because a blank fee reads as though nobody knows. It does not expire on a date, but it is not permanent either: it is valid only while you are actively engaged in business as a seller, and the Comptroller's office may cancel it on finding that you are not. Filing obligations keep it alive, so a return must be filed for every period even when there were no taxable sales or purchases to report. Apply through Comptroller eSystems and allow two to three weeks.

Sources

Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.

  1. Development Services permit fees — Adopted Annual Budget, effective 1 October 2025 to 30 September 2026City of Killeen · primary source · retrieved 2026-08-24
  2. 5200, Fees — Child Care Regulation HandbookTexas Health and Human Services · primary source · retrieved 2026-08-20
  3. Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
  4. Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22
  5. Sales and Use Tax Permit — Texas ComptrollerTexas Comptroller of Public Accounts · primary source · retrieved 2026-08-20

Related

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.