9 permits · verified 2026-08-24
What permits do you need to open a childcare centre in Waco?
In short
A childcare centre in Waco, TX has 7 permits that apply to every business of this type, plus 2 more that depend on your premises, signage or how you are set up. City of Waco Inspection Services charges $50 per change of record for the certificate of occupancy. 4 of the 9 are charged as a range or formula rather than a flat fee. Verified 2026-08-24 against the issuing agencies’ published fee schedules.
The permits at a glance
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Commercial Building Permit | City of Waco Inspection Services | $0.28 per sq ft for the first 100,000 sq ft, then $0.14 per sq ft | renewal is 50% of the original permit fee, minimum $60 | 2026-08-24 |
| Commercial Plan Review Fee | City of Waco Inspection Services | the greater of $100 or 25% of the total building permit fee | one-time, per application | 2026-08-24 |
| Commercial Alteration and Repair Permit | City of Waco Inspection Services | $50 minimum to $2,000 of valuation; $50 for the first $2,000 plus $5.50 per additional $1,000 to $50,000; $265 plus $4.50 per $1,000 to $100,000; $490 plus $3.50 per $1,000 to $500,000; $1,890 plus $2.50 per $1,000 above that | renewal is 50% of the original permit fee, minimum $60 | 2026-08-24 |
| Certificate of Occupancy | City of Waco Inspection Services | $50 per change of record | does not expire; a new certificate is required on a change of occupancy classification, tenancy, ownership, business name or type of business | 2026-08-24 |
| Fire Marshal Operational Permit | Waco Fire Department, Fire Marshal's Office | Not published | not stated in the published material | 2026-08-24 |
| Child Care Licence | Texas Health and Human Services | $35 application, then an annual fee of $35 plus $1 per child of licensed capacity | annual | 2026-08-20 |
| Certificate of Formationonly if it applies to you | Texas Secretary of State | $300 one-time filing | no expiry | 2026-08-20 |
| Assumed Name Certificate (DBA)only if it applies to you | Texas Secretary of State | $25 one-time filing | up to ten years, renewable | 2026-08-21 |
| Texas Sales and Use Tax Permit | Texas Comptroller of Public Accounts | No fee — there is no fee for this permit | no expiry while actively engaged in business | 2026-08-21 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
How much does it actually cost to permit a childcare centre in Waco?
There is no single figure, and any site quoting one is rounding away the part that matters. Of the 9 records listed for a childcare centre in Waco, TX, 7 apply to every business of this type and 2 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.
Of the 7 that always apply, 2 carry a flat fee, coming to $50.00. That is a floor, not a total. 4 of the 9 are charged as a range or a formula set by the issuing agency, and 1 has no fee published at all. The ones that vary:
Commercial Building Permit: $0.28 per sq ft for the first 100,000 sq ft, then $0.14 per sq ft
Commercial Plan Review Fee: the greater of $100 or 25% of the total building permit fee
Commercial Alteration and Repair Permit: $50 minimum to $2,000 of valuation; $50 for the first $2,000 plus $5.50 per additional $1,000 to $50,000; $265 plus $4.50 per $1,000 to $100,000; $490 plus $3.50 per $1,000 to $500,000; $1,890 plus $2.50 per $1,000 above that
Child Care Licence: $35 application, then an annual fee of $35 plus $1 per child of licensed capacity
Which offices issue these permits in Waco?
Permits for a childcare centre in Waco, TX come from 5 separate offices: City of Waco Inspection Services, Waco Fire Department, Fire Marshal's Office, Texas Health and Human Services, Texas Secretary of State, Texas Comptroller of Public Accounts. No single office issues them all, which is why an opening means filing in several places rather than one.
Is anything about these requirements changing?
Waco prices commercial construction on floor area rather than declared valuation, which is unusual in Texas and much easier to estimate before design is finished: $0.28 a square foot to 100,000 sq ft and $0.14 above it, the same rates whether the occupancy is assembly, business, educational, factory, hazardous, mercantile or multi-family residential, and the same again for storage and shell buildings. A technology fee of $15 is added to building permits. Starting work before the permit issues doubles the fee, and the schedule is explicit that paying the doubled fee does not excuse the underlying non-compliance.
Non-refundable, and the floor bites on small projects: a fit-out whose permit fee is $200 still pays $100 to have the plans looked at. Re-review after corrections is $60, changing the design or scope after issue is $60 plus 10% of the original permit fee, and an ICC third-party plan review is $200 an hour. Transferring the permit to a different contractor is $60.
This is the schedule most new tenants actually meet: repairs and alterations to an existing non-residential building, and completion of shell buildings, are valuation-based even though new construction is area-based. A $150,000 restaurant fit-out lands at roughly $665 in building permit fees. Reinspection escalates rather than repeating — $55 for the first failure, $100 for the second, $150 for the third and beyond — and the schedule notes that the contractor stays liable for failed reinspection fees even where the project itself is exempt from permit fees.
A building may not be used or occupied until the Building Official issues the certificate, which happens after the building passes final inspection. Waco's trigger list is broader than most and was rewritten in November 2025: a new certificate is required not only on first occupancy and on a change of occupancy classification under IBC Chapter 3, but on a change of tenancy or ownership of the space, a change in the name or ownership of the business, and a change in the type of business — the city's own examples include turning retail into a restaurant or a hair salon, and adding a coffee shop to an existing space. Single and two-family dwellings are excluded. The $50 shown is the certificate of occupancy change of record fee on the permit schedule; the certificate issued at the end of a construction permit is covered by that permit.
The Fire Prevention Section reviews and approves construction plans, inspects fire protection systems, carries out acceptance testing and runs compliance inspections on existing commercial businesses. The operational permit application is published, and the city states that all forms and permits requiring payment must be paid to Fiscal Management Services at City Hall — but no amount is published for it, so none is shown here. A fire final inspection is required and is separate from the building final.
Worked example: a centre licensed for 100 children pays $135 a year ($35 + $1 x 100). The annual fee falls on the anniversary of the date the initial licence was issued, not on a calendar date.
Required to form an LLC or corporation, not to trade as a sole proprietor. Texas has no statewide general business licence, so for many businesses this filing plus a sales and use tax permit is the entire state-level obligation.
Only needed if you trade under a name different from the one on your formation filing. The certificate is effective for a term not exceeding ten years from the date of filing and does not roll over by itself — it must be actively renewed, and a new certificate can be filed within six months of the original expiring. The $25 is the Secretary of State fee; sole proprietors and general partnerships file with the county clerk instead, at county rates.
There is no fee for this permit — the Comptroller says so directly, which is worth stating because a blank fee reads as though nobody knows. It does not expire on a date, but it is not permanent either: it is valid only while you are actively engaged in business as a seller, and the Comptroller's office may cancel it on finding that you are not. Filing obligations keep it alive, so a return must be filed for every period even when there were no taxable sales or purchases to report. Apply through Comptroller eSystems and allow two to three weeks.
Sources
Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.
- Permit Fee SchedulesCity of Waco Inspection Services · primary source · retrieved 2026-08-24
- Certificate of Occupancy — Sec. 6-37 as amended by Ordinance No. 2025-814City of Waco Inspection Services · primary source · retrieved 2026-08-24
- Fire Prevention — permits, forms and controlled burn requirementsWaco Fire Department · primary source · retrieved 2026-08-24
- 5200, Fees — Child Care Regulation HandbookTexas Health and Human Services · primary source · retrieved 2026-08-20
- Formation of Texas Entities FAQs - Texas Secretary of StateTexas Secretary of State · primary source · retrieved 2026-08-22
- Form 503 - Instructions for Assumed Name CertificateTexas Secretary of State · primary source · retrieved 2026-08-22
- Sales and Use Tax Permit — Texas ComptrollerTexas Comptroller of Public Accounts · primary source · retrieved 2026-08-20
Related
- All permits in Waco
- Childcare centres — national overview
- Childcare centres in Fort Worth, TX
- Childcare centres in Grand Prairie, TX
- Childcare centres in Arlington, TX
- Childcare centres in San Antonio, TX
- Childcare centres in Pasadena, TX
- Auto repair shops in Waco
- Coffee shops in Waco
- Contractors and trades in Waco
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.