In short
Bexar County Public Works issues 4 permits we publish for Bexar County, last verified 2026-09-28. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.
What this agency issues
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Post Construction Permitonly if it applies to you | Bexar County Public Works | $50–$250 flat fee of $50.00 or $250.00, depending on the outcome of a required Mitigation Worksheet | issued once per project, submitted concurrently with the Stormwater Quality Site Development Permit | 2026-09-28 |
| Floodplain Development Permitonly if it applies to you | Bexar County Public Works | $50 per activity | issued once per qualifying activity | 2026-09-28 |
| Stormwater Quality Site Development Permitonly if it applies to you | Bexar County Public Works | $500 flat, per Stormwater Quality Site Development Permit application, payable to the Bexar County Clerk | issued once per project; disturbance may not begin until the permit is issued | 2026-09-28 |
| Right-of-Way Permitonly if it applies to you | Bexar County Public Works | $35.00 per driveway. $35.00 per miscellaneous activity. $75.00 per median opening. $75.00 per auxiliary lane. $35.00 per utility service-line connection. | issued once per activity or connection | 2026-09-28 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
About each permit
Post Construction Permit
A contractor developing a site in unincorporated Bexar County that disturbs one acre or more submits this Post Construction Permit application to Public Works alongside the Stormwater Quality Site Development Permit — the same trigger, submitted at the same time. The fee is either $50.00 or $250.00, set by the outcome of a Mitigation Worksheet the applicant completes as part of the submission. This is a distinct fee-schedule line item from the Stormwater Quality permit's own $500.00 fee, not a substitute for it.
Floodplain Development Permit
Any property encumbered by, or within 100 feet of, a FEMA 1%-annual-chance (100-year) floodplain in unincorporated Bexar County needs a Floodplain Development Permit from Public Works before construction, grading, or other qualifying development activity, at a flat $50.00 per activity. Applications are submitted through Public Works or the County's online permitting portal. Inside San Antonio or another incorporated city, that city's own floodplain-management program applies instead.
Stormwater Quality Site Development Permit
Any new development in unincorporated Bexar County that will disturb one acre or more of land — or a smaller parcel that is part of a larger common development — needs this $500.00 permit from Public Works before ground disturbance begins; the application instructions direct the fee to be paid by check to the Bexar County Clerk. A contractor performing the site work most commonly applies, but the requirement reaches whichever business is developing the site. This permit is submitted concurrently with the Post Construction Permit, listed as a separate Bexar County requirement, which shares the same one-acre trigger.
Right-of-Way Permit
Construction of a new driveway, a median opening, an auxiliary lane, or a new utility service-line connection within a county-maintained right-of-way in unincorporated Bexar County needs this permit from Public Works: $35.00 for a driveway, $35.00 for a miscellaneous activity, $75.00 for a median opening, $75.00 for an auxiliary lane, and $35.00 for a utility service-line connection. A contractor performing the access work most commonly applies, but any business needing new driveway or utility access in county right-of-way is reached by this requirement. Inside San Antonio or another incorporated city, that city's own right-of-way permitting applies instead.
Contact
- Jurisdiction
- Bexar County
- Phone
- Not verified — use the website
Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.
Sources
Every fee and term above was read from one of these government pages on the date shown.
- Floodplain Development PermitsBexar County Public Works · primary source · retrieved 2026-09-28
- Post Construction PermitsBexar County Public Works · primary source · retrieved 2026-09-28
- Right-of-Way Permits (per-activity fee schedule)Bexar County Public Works · primary source · retrieved 2026-09-28
Other offices serving Bexar County
The full permit list for this jurisdiction
Industry permit lists that include this agency
- Restaurants in Bexar County
- Coffee shops in Bexar County
- Retail stores in Bexar County
- Salons and barbers in Bexar County
- Food trucks in Bexar County
- Fitness studios in Bexar County
- Childcare centres in Bexar County
- Contractors and trades in Bexar County
- Auto repair shops in Bexar County
- Veterinary clinics in Bexar County
Texas jurisdictions
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.