Commercial Compliance Hub

Wilmington

Wilmington Fire Department, Fire Marshal's Office (Fire Prevention Division)

In short

Wilmington Fire Department, Fire Marshal's Office (Fire Prevention Division) issues 2 permits we publish for Wilmington, last verified 2026-09-12. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Fire Protection Plan ReviewWilmington Fire Department, Fire Marshal's Office (Fire Prevention Division)$9.00 per $1,000 of construction cost up to $1,000,000, plus $5.00 per $1,000 of construction cost above $1,000,000, with a $200.00 minimum fee for estimated construction costs under $20,000.00.one-time, per project; required at least prior to beginning work2026-09-12
Fire Annual Permit (activity-based schedule)only if it applies to youWilmington Fire Department, Fire Marshal's Office (Fire Prevention Division)There is no single flat annual rate. City Code §12-99(d) sets a per-activity FIRE PERMIT FEES schedule (effective July 1, 2023), and a business owes an annual fire permit only where it conducts a listed activity. The lines carrying an express annual fee are: liquid propane gas, $100.00 for a dealer/distributor or permanent installation, $75.00 where total tank capacity is under 299 water gallons and $150.00 where it exceeds 300 water gallons; compressed natural gas dealer/distributor, $100.00; flammable and combustible liquid tanks, $50.00 per site; spray booth, $100.00; tire storage, $150.00; and welding, cutting or burning, $50.00 annually or $25.00 per site. Single-charge permits in the same schedule include bulk oil storage $100.00, public filling station $100.00, vehicle-repair garage $50.00 (plus $75.00 for fuel dispensing), hazardous chemicals at or above 500 pounds or 55 gallons $200.00, junkyard/salvage yard $150.00, lumber storage $100.00, refineries $100.00, fumigation $25.00 per application, tents $50.00, fireworks display $50.00, and sale of small arms ammunition $50.00. Installation charges are separate from the annual fee on the tank and spray-booth lines. Section 12-99(d) closes with a catch-all: a permit required but not classified in the schedule is priced by the chief of fire or the fire marshal.annual for the activities carrying an express annual fee; the City bills these through its own 'Fire Annual Permits Bills' category2026-09-12

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

Fire Protection Plan Review

Required for any project involving fire alarm, sprinkler, fixed fire extinguisher, or hood suppression systems, or other construction affecting fire/life safety. The Fire Marshal's Office's own current departmental page confirms this is a real, recent increase, stating in its own banner 'EFFECTIVE 1/1/2024 – FIRE MARSHAL'S OFFICE FEES HAVE INCREASED.' The City's own 2016 Development Review guide had previously priced the identical review at a $150.00 minimum fee, $7.00 per $1,000 up to $1 million, and $3.00 per $1,000 above that — now superseded by the current $200.00 minimum, $9.00, and $5.00 figures recorded above. A current copy of the City's own Business License is required as part of the plan review submission.

Fire Annual Permit (activity-based schedule)

City Code §12-99(d) sets no flat annual fire permit rate. The City's bill-search portal names 'Fire Annual Permits Bills' as a distinct billing category, but that category is the billing wrapper for the per-activity schedule in §12-99(d), not a charge every business pays. The adopting ordinance presents that schedule in strike-through/underline form, so both the prior and current columns are visible. Two independent cross-checks support the reading: the Fire Marshal's Office's own current Miscellaneous Permits application (form FM-27, dated 1/22/2024) prints Bulk Storage $100.00, Fumigation $25.00, Hazardous Chemicals $200.00, Junkyard/Salvage $150.00, Lumber Storage $100.00, Refineries $100.00, Spray Booth Installation $100.00 and Spray Booth $100.00 — every one matching this ordinance's post-amendment column exactly; and the same ordinance's Chapter 4 and Chapter 5 amendments independently reproduce the zoning board of adjustment and business license figures listed elsewhere for this jurisdiction. Of the ten industries this site tracks, the schedule reaches an auto-repair shop most directly (vehicle-repair garage $50.00, fuel dispensing $75.00, spray booth $100.00 annually). Separately and in addition, §12-64(c)(7) prices a mobile food service fire inspection at $75.00 annually with a $25.00 re-inspection, and §12-64(c)(1) prices annual license-renewal inspections for child care at $75.00 for a home daycare of one to six children, $100.00 for a large home daycare of seven to twelve, and $200.00 for a children care centre of twelve or more, with no waivers permitted. All of this is separate from the one-time Fire Protection Plan Review fee listed elsewhere for this jurisdiction, which applies to new construction or renovation.

Contact

Jurisdiction
Wilmington
Phone
(302) 576-3120

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. Business License Search / bill-payment portal — confirms Sign, Public Assembly, and Elevator annual L&I bills and a separate Fire Annual Permits bill categoryCity of Wilmington · primary source · retrieved 2026-09-12
  2. Fire Marshal's Office — the department's own current page, confirming the 1/1/2024 fee increaseCity of Wilmington Fire Marshal's Office · primary source · retrieved 2026-09-12
  3. Fire Protection Plan Review Application, revised 1/3/2024 — current plan-review fee scheduleCity of Wilmington Fire Marshal's Office · primary source · retrieved 2026-09-12
  4. Ordinance #0288 (Ord. 23-014), 'An Ordinance to Amend Chapters 4, 5 and 12 of the Wilmington City Code to Increase Certain Fees,' effective July 1, 2023 — strike-through/underline amendments to Chapter 4 §109.2.7(c) (zoning board of adjustment application fees), Chapter 5 §5-101 (the full business license Schedule of Fees), and Chapter 12 §§12-64 and 12-99(d) (fire plan review, inspection, event and hazardous-materials permit fees)Wilmington City Council · primary source · retrieved 2026-09-12
  5. Wilmington Development Review Process (as of 6/07/16) — the $25.00 Zoning Certificate fee, ZBA process description, and 2016 fee figuresCity of Wilmington · primary source · retrieved 2026-09-12
  6. Wilmington Fire Marshal's Office, Fire Prevention Division — Miscellaneous Permits application (form FM-27, dated 1/22/2024), printing the per-activity permit fees for bulk storage, fumigation, hazardous chemicals, junkyard/salvage, lumber storage, refineries, and spray booth installation and operationCity of Wilmington Fire Marshal's Office · primary source · retrieved 2026-09-12

Other offices serving Wilmington

The full permit list for this jurisdiction

Industry permit lists that include this agency

Delaware jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.