Commercial Compliance Hub

Fort Smith

City of Fort Smith Utility Department, Environmental Quality Division

In short

City of Fort Smith Utility Department, Environmental Quality Division issues 1 permit we publish for Fort Smith, last verified 2026-09-10. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
FOG (Fats, Oils and Grease) Generator PermitCity of Fort Smith Utility Department, Environmental Quality DivisionNo feenot stated in the published fee schedule2026-09-10

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

FOG (Fats, Oils and Grease) Generator Permit

A local requirement for restaurants, coffee shops, bakeries, cafeterias and similar food-service facilities. The City's FOG-Commercial page states that the FOG Program is a requirement of the Consent Decree issued by the Environmental Protection Agency and the Department of Justice, carried out by issuing permits to foodservice and/or preparation facilities that generate and discharge FOG. The FOG Permit Application Form (Ordinance 89-16) states no application fee, and a fee for the FOG permit itself is not published in the City's FOG documents. The City's Pretreatment program charges and fees document (City Code § 25-216) sets $82.00 a month plus per-sample sampling and analysis fees for each industrial user and does not say whether that charge applies to a FOG-only food-service permit; contact the Environmental Quality Division (479-494-3938) for the cost. The application also asks a facility with a grease control device which permitted FOG hauler it uses.

Contact

Jurisdiction
Fort Smith
Phone
(479) 494-3938

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. FOG - Permit Distribution — confirming the FOG Program was established by City Ordinance 89-16 and naming the Environmental Monitoring Supervisor as the FOG permit contactCity of Fort Smith, Utility Department, Environmental Quality Division · primary source · retrieved 2026-10-08
  2. FOG Permit Application Form (Ordinance # 89-16) — Application for Fats, Oils and Grease (FOG) Wastewater Discharge Permit, naming Full/Limited Service Restaurant, Snack/Coffee/Donut/Ice Cream Shop and other NAICS-coded food-service categories, with no application fee stated on the formCity of Fort Smith, Utility Department · primary source · retrieved 2026-10-08
  3. FOG-Commercial — describing the FOG Program as an EPA/DOJ Consent Decree requirement and linking the FOG Generator Permit, Ordinance 89-16, and Pretreatment Fees documentsCity of Fort Smith, Utility Department, Environmental Quality Division · primary source · retrieved 2026-10-08
  4. Pretreatment program charges and fees (City Code § 25-216) — $82.00/month industrial-user charge plus itemised sampling and analysis fees (metals, BOD5, COD, TSS, oil and grease, cyanide, flash point, pH) and the $2,000/year septic tank discharge permit feeCity of Fort Smith, Utility Department · primary source · retrieved 2026-10-08

Other offices serving Fort Smith

The full permit list for this jurisdiction

Industry permit lists that include this agency

Arkansas jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.