Commercial Compliance Hub

14 published records

Business licenses and permits in New Braunfels, Texas

New Braunfels prices its food permit on employee count in three bands that land exactly on the state figures — $258, $515 and $773 — because its adopting ordinance follows Senate Bill 1008, which caps a local permit at what Texas DSHS would charge. Several categories sit outside the employee bands entirely: a tavern is $100, a grocery $250 and a meat processor $100. Non-profits and state-licensed adult or childcare facilities pay nothing at all. Plan review is charged as half the annual permit fee rather than as a flat sum, so it scales with the band you fall into. The frozen dessert manufacturer permits are unusual — few Texas cities license that separately.

What are you opening in New Braunfels?

Permits that apply to every type of business in New Braunfels

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
New Occupant PermitCity of New Braunfels Building Division$150 per permitnot stated in the published schedule2026-08-25
Commercial Building PermitCity of New Braunfels Building Division$100 commercial application fee, then by valuation: $50 plus $6 per $1,000 to $50,000; $350 plus $5 per $1,000 to $500,000; $2,600 plus $4 per $1,000 above. New construction and additions are charged on square footage instead, from ICC Building Valuation Data by occupancy group and construction typeper permit2026-08-25
Electrical, Plumbing, Mechanical and Fuel Gas Permitonly if it applies to youCity of New Braunfels Building Division$100 commercial permit application feeper permit2026-08-25
Fire Sprinkler and Fire Alarm System PermitCity of New Braunfels Fire Department, Fire Marshal$120–$2,000 per system, by device or head countper permit2026-08-25
Sign Permitonly if it applies to youCity of New Braunfels Planning and Development Services$2.50 per square foot of sign face, minimum $50per permit2026-08-25

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

What do these permits involve in New Braunfels?

New Occupant Permit

$150, and the schedule notes it was previously called an existing certificate of occupancy — worth knowing, because the older name is still what most landlords and brokers will say. This is the permit for taking on premises that already exist rather than certificating a new build. A temporary certificate of occupancy and its extension are priced in Schedule B rather than here. Commercial inspections are $50 each, reinspections start at $35 and double for each subsequent one, so a third reinspection is $140.

Commercial Building Permit

Two methods, and which applies turns on whether there is new floor area. Alterations, fit-outs, fences, pools and infrastructure run off Schedule A's valuation table. New construction and additions run off Schedule B, calculated on square footage by IBC occupancy group and construction type from ICC Building Valuation Data — so a restaurant (A-2) and a repair garage (S-1) on the same footprint pay different amounts. A shell building is charged at 80 per cent. Commercial plan review is 25 per cent of the permit cost capped at $15,000, payable before the second round of comprehensive review. Working without a permit doubles the fee up to a $10,000 ceiling.

Electrical, Plumbing, Mechanical and Fuel Gas Permit

The $100 commercial permit application fee applies to all new construction, additions and substantial alterations, with the trade permits themselves priced in Schedule B of the appendix. Two administrative lines are worth budgeting for on any job that slips: a stop-work order costs $100 to issue and another $100 to lift, and a commercial alternate method request under the building codes is $150.

Fire Sprinkler and Fire Alarm System Permit

A sprinkler system is $300 up to 200 heads and $300 plus $0.75 for each head beyond, capped at $2,000. An alarm system is $240 up to 200 signalling devices, then $300 plus $0.75 per device capped at $1,000. Modifications are cheaper — $120 for sprinkler work up to 200 heads, $225 for an existing alarm up to 10 devices. A standpipe or fire line is $300 and a private fire hydrant acceptance $100 for up to three plus $25 each after. Preliminary fire systems plan review is charged by time at $60 an hour, and a fire watch at $100 per hour per person, which is the line that makes a failed system expensive to sit out.

Sign Permit

Priced by area rather than by type: $2.50 a square foot with a $50 floor, so a 40 square foot monument sign is $100 and a 200 square foot pylon $500. That makes New Braunfels cheap for small signage and expensive for large, the opposite of the flat rates most cities here use. A temporary on-premises banner is $50. The number to avoid is $750, which buys an alternative sign plan or a sign variance — worth more than most sign permits, so design within the ordinance if you can.

Sources

Every figure in the table above was read from one of these government pages on the date shown.

  1. City of New Braunfels Code of Ordinances Appendix D, Fee ScheduleCity of New Braunfels · primary source · retrieved 2026-08-25

Who issues business permits in New Braunfels?

Permitting in New Braunfels is split across 4 agencies we hold records for, with tax registration handled at state level. No single office issues everything, which is why an opening usually means filing in several places rather than one.

New Braunfels issuing agencies

Other Texas jurisdictions we cover

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.