14 published records
Business licenses and permits in Elkhart County, Indiana
Elkhart County, Indiana, seat Goshen; population 207,436 (U.S. Census Bureau 2024 estimate). The Elkhart County Health Department's Environmental Health division licenses food service establishments, mobile and temporary food operations and swimming pools under County Code chapters 112 and 114, and permits septic systems; County Code 112.04(A) provides that "No person shall operate a food service in the county without a valid food service license issued by the Health Officer". The Building Department within the Planning and Development Department issues building, sign and trade permits and certificates of occupancy under the county Building Code (County Code chapter 151), whose fees are set in section 151.11, and licenses Class A electrical contractors under chapter 113. Zoning runs through the Elkhart County Development Ordinance (County Code chapter 158), which under section 158.01(F) applies to all land in the county except the planning jurisdictions of the Cities of Goshen, Elkhart and Nappanee, and names the town councils of Bristol, Middlebury, Millersburg and Wakarusa and the Board of County Commissioners as its legislative bodies. The county's incorporated municipalities are the cities of Elkhart, Goshen and Nappanee and the towns of Bristol, Middlebury, Millersburg and Wakarusa. Each adopts its own ordinances and may require its own licenses and permits, which stack on the county and state records.
What are you opening in Elkhart County?
- RestaurantsFull-service restaurants carry the densest permit load of any small business: food, fire, occupancy, waste, and usually alcohol.See the full permit list
- Coffee shopsCafés are permitted as food service establishments even where no cooking happens, and the plan review step catches most operators by surprise.See the full permit list
- Retail storesRetail is the lightest common permit load, but the sales tax permit and the certificate of occupancy are non-negotiable in every jurisdiction.See the full permit list
- Salons and barbersPersonal care is licensed at state board level as well as locally, so the shop license and the practitioner licenses are separate obligations.See the full permit list
- Food trucksMobile food is the one category with no certificate of occupancy — but it gains a commissary agreement, and the unit itself is inspected rather than the premises.See the full permit list
- Fitness studiosPrepaid memberships trigger state registration and often a surety bond, which catches operators who budgeted only for the fit-out.See the full permit list
- Childcare centresThe heaviest permit load of any small business: state agency licensing, per-person background checks, and a stricter fire standard than ordinary commercial use.See the full permit list
- Contractors and tradesLicensed at state board level rather than locally, and the only common category with no premises permits at all — the bond is usually the long pole.See the full permit list
- Auto repair shopsOrdinary commercial permitting plus an environmental layer: waste oil, solvents and stormwater are each registered separately.See the full permit list
- Veterinary clinicsA state facility permit, controlled substances registration at both state and federal level, and a medical waste manifest — none of which a general business license covers.See the full permit list
Permits that apply to every type of business in Elkhart County
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Onsite Sewage (Septic) System Permit — Commercial (Elkhart County Health Department)only if it applies to you | Elkhart County Health Department — Environmental Health | The permit fee is set in the Elkhart County Health Department Fee Schedule; the Health Department's septic page states that the system drawing is submitted "with the appropriate application and fee". Contact Environmental Health at 574-971-4600 for the current amount. | per system installation, repair or replacement | 2026-10-15 |
| Commercial Building Permit (Elkhart County Building Department)only if it applies to you | Elkhart County Planning and Development — Building Department | Commercial building application fee by floor area: first 25,000 sq ft $200; 25,001–50,000 sq ft $400; 50,001–100,000 sq ft $500; over 100,000 sq ft $500 plus $0.02 per sq ft over 100,000. Plus, per item: construction plan review $100; site plan review $100; base plumbing fee $40 plus $5 for each fixture drain line; mechanical $50 for each heating, cooling, make-up air or refrigeration unit; gas lines $50; electrical service up to 100 A $35, up to 200 A $40, up to 400 A $50, up to 800 A $100, up to 2,000 A $200, over 2,000 A $400; footings and structural first 25,000 sq ft $50, 25,000–50,000 $75, 50,000–100,000 $100, over 100,000 $150 plus $0.02 per sq ft over 100,000; fire suppression or sprinkler system up to 150 heads $50, 151–300 $100, over 300 $200; extension of permit $200. Work started before the permit: civil penalty equal to twice the normal fee. | expires one year after issuance if construction has not reached final inspection; commercial permits may be extended for six months (County Code 151.06(E)) | 2026-10-15 |
| Data Management (GIS) Fee on Nonresidential Building Permits (Elkhart County)only if it applies to you | Elkhart County Planning and Development — Building Department | $50 per new nonresidential (commercial/industrial) building permit; $25 for a nonresidential addition, a new nonresidential non-building structure or another new nonresidential building, as set in Elkhart County Code 41.131(A) (Ord. 03-238; Ord. 07-78); collected with the permit application | one-time, with each permit application | 2026-10-15 |
| Certificate of Occupancy (Elkhart County Building Commissioner)only if it applies to you | Elkhart County Planning and Development — Building Department | $35 per certificate of occupancy, as set in Elkhart County Code 151.11 Table IV (Ord. 2015-214); re-inspections $35 for the first, $50 for the second and $65 for each later one, paid before the certificate is issued | one-time, issued after final inspection | 2026-10-15 |
| Improvement Location Permit (Elkhart County Zoning Administrator)only if it applies to you | Elkhart County Planning and Development — Zoning Administrator | The application fee is charged by Elkhart County Planning and Development; contact the department for the amount that applies to a given project. | work must commence within 6 months and be completed within 24 months of approval; up to two 30-day renewals (Elkhart County Development Ordinance 158.11(L)(5)) | 2026-10-15 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
What do these permits involve in Elkhart County?
Onsite Sewage (Septic) System Permit — Commercial (Elkhart County Health Department)
A business site in Elkhart County that is not on a public sewer goes through the Elkhart County Health Department for its onsite sewage system; a site on a public sewer has no septic permit. The Health Department's septic page says installations must meet the commercial rule 410 IAC 6-10.1 and the Elkhart County Private Sewage System Ordinance 2012-153, and that all septic tanks, dosing chambers, aerobic treatment units and soil absorption fields require an Elkhart County Health Department permit before installation, by a registered installer. For commercial properties, soil borings must be done by a Registered Soil Scientist and sent to the Indiana State Department of Health for minimum requirements; a to-scale system drawing then goes to the state or to the county Health Department with the application and fee, and designs of 750 gallons per day or less are typically referred to the county for plan review without an engineer's or architect's stamp. County Code 151.06(C)(1) adds that plans for any commercial or industrial building permit must include a preliminary report from the Health Department's Environmental Health Division, based on a soil scientist's sample, on the sewage system best suited to the site. Applications are taken at 4230 Elkhart Rd, Goshen; contact Environmental Health at 574-971-4600 for the current fee.
Commercial Building Permit (Elkhart County Building Department)
Elkhart County Code 151.06(B)(2) provides that no one may construct, alter, repair, remodel or add to a building, or do plumbing, electrical, heating, ventilation or air conditioning work, before the Building Commissioner approves a written application and issues a permit; painting and routine maintenance that does not affect those systems or structural stability are exempt (151.06(B)(4)). A Class 1 structure needs the state's construction design release first, and its plans may be filed on paper or as PDF (151.06(B)(1), (3)). As set in County Code 151.11 Table II (Ord. 2015-214, passed July 6, 2015, effective August 1, 2015, and reproduced in the Building Department Fee Schedule on the Planning and Development site), commercial, industrial and multi-family buildings pay an application fee of $200 for the first 25,000 square feet, $400 to 50,000, $500 to 100,000 and $500 plus $0.02 a square foot above that, plus item fees such as $100 construction plan review, $100 site plan review, $40 base plumbing plus $5 a fixture drain line, $50 a mechanical unit, $50 gas lines and $35 to $400 for electrical service. The county Building Code ordinance applies in the unincorporated area of Elkhart County and in any municipality that elects by ordinance to be subject to it. Permits expire after one year without final inspection, with a six-month commercial extension (151.06(E)). Work started before the permit carries a civil penalty of twice the normal fee.
Data Management (GIS) Fee on Nonresidential Building Permits (Elkhart County)
Elkhart County Code 41.131(A) assesses a data management fee on each listed permit processed by the county planning department, in addition to the permit's own fee. As set in that section (Ord. 03-238, passed June 16, 2003; Ord. 07-78, passed February 26, 2007), the fee is $50 on a building permit for a new nonresidential (commercial/industrial) building, and $25 on a permit for a nonresidential addition, a new nonresidential non-building structure or another new nonresidential building; a demolition permit carries $25. Under 41.131(B) the fee is a supplementary fee added to the fees set by the county's other ordinances, and it is paid and collected when the permit application is made. A business building, adding to or demolishing a commercial building in the area covered by the county Building Department therefore pays this fee alongside the commercial building permit fees of County Code 151.11.
Certificate of Occupancy (Elkhart County Building Commissioner)
Under Elkhart County Code 151.06(D), no building for which a permit is required may be used or occupied, other than to complete the work, until the Building Commissioner has issued both an occupancy permit and a utility service hook-up authorization, and after final inspection the Building Commissioner issues a certificate of occupancy. The Elkhart County Development Ordinance, section 158.11(P), adds that no land or building may be occupied or used, and no change of use made, without a Certificate of Occupancy; that the certificate is applied for at the same time as the Improvement Location Permit; and that the Zoning Administrator recommends and the Building Commissioner decides. As set in County Code 151.11 Table IV (Ord. 2015-214), the certificate of occupancy costs $35. Re-inspections caused by code violations, uncorrected violations or lock-outs cost $35 for the first, $50 for the second and $65 for each one after that, and when a certificate is requested those fees must be paid before it is issued.
Improvement Location Permit (Elkhart County Zoning Administrator)
Under the Elkhart County Development Ordinance, section 158.11(L)(1)(a), an Improvement Location Permit is required before the permanent erection, reconstruction, alteration, movement, conversion, extension or enlargement of a structure or improvement, and before establishing a new nonresidential land use or changing an existing one. An applicant must receive it before a Building Permit is issued, and it does not replace the building permit (158.11(L)(1)(b)–(c)). Small accessory structures of 120 square feet or less without a permanent foundation, landscaping, property maintenance, and a permitted home occupation without new construction need none (158.11(L)(2)). The Zoning Administrator approves, approves with conditions or denies the permit after checking the project against the ordinance, any approved plat, planned unit development, special use permit or variance, and the site's access to a public right-of-way. Work must start within 6 months and finish within 24 months, with at most two 30-day renewals. Under 158.11(P)(2)(c) the Certificate of Occupancy is applied for at the same time. Under 158.01(F) the ordinance covers all of Elkhart County except the planning jurisdictions of Goshen, Elkhart and Nappanee; a site inside those cities follows the city's own zoning process.
Sources
Every figure in the table above was read from one of these government pages on the date shown.
- Septic Permits — Septic System Information and Installation GuidelinesElkhart County Health Department · primary source · retrieved 2026-10-15
- Elkhart County Code 151.06, Permits (Ord. 08-400; Ord. 2013-330)Elkhart County, Indiana (codified by American Legal Publishing) · primary source · retrieved 2026-10-15
- Elkhart County Code 151.11, Fee Schedule (Ord. 2015-214, passed July 6, 2015)Elkhart County, Indiana (codified by American Legal Publishing) · primary source · retrieved 2026-10-15
- Building Department Fee Schedule — Commissioner Ordinance No. 2015-214 (effective August 1, 2015)Elkhart County Planning and Development · primary source · retrieved 2026-10-15
- Elkhart County Building Code Ordinance 2013-330Elkhart County Planning and Development · primary source · retrieved 2026-10-15
- Elkhart County Code 41.131, Data Management Fees (Ord. 03-238; Ord. 07-78)Elkhart County, Indiana (codified by American Legal Publishing) · primary source · retrieved 2026-10-15
- Elkhart County Development Ordinance (adopted April 22, 2024; effective June 1, 2024; amended May 18, 2026)Elkhart County Planning and Development · primary source · retrieved 2026-10-15
Who issues business permits in Elkhart County?
Permitting in Elkhart County is split across 4 agencies we hold records for, with tax registration handled at state level. No single office issues everything, which is why an opening usually means filing in several places rather than one.
Elkhart County issuing agencies
- Elkhart County Health Department — Environmental HealthFood service licenses, food establishment plan review, mobile and temporary food licenses and event coordinator applications (County Code chapter 112, Elkhart County Food Service Ordinance) · Swimming pool licenses, person-in-charge proficiency exams and pool plan review (County Code chapter 114, Elkhart County Swimming Pool Ordinance) · Onsite sewage (septic) system permits under the Elkhart County Private Sewage System Ordinance 2012-1536 permits
- Elkhart County Planning and Development — Building DepartmentBuilding, plumbing, mechanical, electrical and sign permits and certificates of occupancy under the county Building Code (County Code chapter 151; fees in section 151.11) · Class A electrical contractor licenses, issued by the Building Commissioner on approval of the Electrical Examining Board (County Code chapter 113)5 permits
- Elkhart County Planning and Development — Zoning AdministratorImprovement location permits and use approvals under the Elkhart County Development Ordinance (County Code chapter 158), which applies outside the planning jurisdictions of Goshen, Elkhart and Nappanee2 permits
- Indiana Alcohol and Tobacco Commission — Elkhart County Local Alcoholic Beverage BoardInvestigates and votes on applications for alcoholic beverage retailer and dealer permits in Elkhart County, as described on the ATC's Alcohol Permit Information page1 permit
Other Indiana jurisdictions we cover
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.
