Atlanta spans both Fulton and DeKalb counties, each running its own separate food establishment permitting program with its own fee table. The City's building and permitting fee pages were reorganized and do not publish current dollar figures.

What are you opening in Atlanta?

Permits that apply to every type of business in Atlanta

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Occupation Tax CertificateCity of Atlanta Department of Finance, Office of RevenueA flat $50 tax on the first $10,000 of gross receipts, plus a rate set by business classification on receipts above that, plus $25 per employee beyond the first (which is exempt), plus a $191 annual registration fee for the current tax year, plus a $50 zoning review fee on new applications or location changes.annual — must be renewed by February 152026-09-04
Building Permit (Commercial Construction and Alterations)only if it applies to youCity of Atlanta Department of City Planning (Office of Buildings; vending program)A $175 non-refundable minimum initial application fee, plus a building permit fee based on the valuation of the work under Building Code Amendments §104.2 (ICC Table 100 building valuation data); 50% of the estimated total permit fee is paid when plans are submitted for reviewexpires if work is not started within six months of issuance or is abandoned for six months2026-10-09
Certificate of Occupancyonly if it applies to youCity of Atlanta Department of City Planning (Office of Buildings; vending program)$100 per story for a tenant build-out of an interior commercial space; $200 for a new one-story commercial building, plus $200 for each added floor up to seven stories, and $300 per floor at eight stories or more; temporary and permanent certificates are each a separate feeone-time2026-10-09
Sign Permitonly if it applies to youCity of Atlanta Department of City Planning (Office of Buildings; vending program)Wall sign: $150 minimum plus $1 per square foot of sign area; freestanding or shopping-centre sign: $450 minimum plus $1 per square foot; portable sign: $75one-time2026-10-09

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

What do these permits involve in Atlanta?

Occupation Tax Certificate

The $191 registration fee is a recent increase — the city charged $75 for tax year 2025 and prior. Missing the February 15 renewal deadline draws a flat $500 penalty, and unpaid balances accrue 1.5% monthly interest after April 1, plus a further 10% penalty after June 30.

Building Permit (Commercial Construction and Alterations)

Figures are from the City's Building Code Amendments in the Code of Ordinances. §104.1(b) (Ord. 2025-07, 2-17-25): 'A nonrefundable minimum initial permit application fee of $175.00 shall be imposed for all building permit applications accepted for review.' §104.1(c)(i): applicants pay 50% of the total building permit fee, based on the cost of construction, when submitting for plan review. §104.2 (Ord. 2017-33, 6-28-17) values new work from ICC Table 100 (February 2009 data printed in the code); interior alterations without engineered structural work are valued at a minimum of 20%, and with structural engineering 40%, of new construction value. §104.2 also sets a $50.00 re-inspection fee, a $50.00 fee to change the contractor of record, double fees for work begun without a permit (penalty portion capped at $1,000.00), and MEP permits at a $150.00 minimum plus $150.00 for each additional trade.

Certificate of Occupancy

Building Code Amendments §104.8(a): no new building 'shall be occupied or used, in whole or in part, until a Certificate of Occupancy shall have been issued by the Director', and §104.8(c) applies the same rule to a building altered so as to change its occupancy classification. Fees are from §104.2(h) (Ord. 2017-33, 6-28-17): 'New commercial building of one story shall be $200.00'; over one story but under eight stories '$200.00 plus $200.00 per additional floor or portion thereof'; eight stories or higher '$300.00 per floor'; 'Tenant build-out for interior commercial spaces shall be $100 per story or portion thereof'. Temporary and permanent certificates 'are each a separate fee', and a duplicate certificate costs $50.00.

Sign Permit

Fees are from Building Code Amendments §104.2(o) (Ord. 2017-33, 6-28-17): wall signs 'Minimum fee of $150.00 plus $1.00 per square foot of sign area'; freestanding signs 'Minimum fee of $450.00 plus $1.00 per square foot of sign area'; 'Shopping center signs shall be charged at the same rate as freestanding signs'; 'Portable signs—$75.00'. A second sign of the same type reviewed on the same application is charged only the per-square-foot amount. All sign permit fees are payable on application and non-refundable, and a sign erected without a permit is charged double (penalty portion capped at $1,000.00, §104.2(g)). The fee does not decide whether a sign is allowed under the City's Sign Ordinance.

Sources

Every figure in the table above was read from one of these government pages on the date shown.

  1. City of Atlanta — occupation tax certificate, flat tax, per-employee fee and annual registration feeCity of Atlanta Office of Revenue · primary source · retrieved 2026-09-04
  2. Atlanta Building Code Amendments Section 104 (permits, fees, certificate of occupancy), Part III Appendix ACity of Atlanta / Municode · primary source · retrieved 2026-10-09

Who issues business permits in Atlanta?

Permitting in Atlanta is split across 8 agencies we hold records for, with tax registration handled at state level. No single office issues everything, which is why an opening usually means filing in several places rather than one.

Atlanta issuing agencies

Other Georgia jurisdictions we cover