What permits do you need to open a contractor or trade in Birmingham?

In short

A contractor or trade in Birmingham, AL has 2 permits that apply to every business of this type, plus 8 more that depend on your premises, signage or how you are set up. Alabama Secretary of State, Business Services charges $200 one-time filing for the certificate of formation (llc). 5 of the 10 are charged as a range or formula rather than a flat fee. Verified 2026-09-08 against the issuing agencies’ published fee schedules.

The permits at a glance

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Zoning Certificate or Information Letteronly if it applies to youCity of Birmingham Department of Planning, Engineering and Permits$50–$100 a Zoning Certificate Letter (zoning classification and flood plain status only) is $50; a more detailed Zoning Information Letter is $100 or more depending on scopeone-time, per request2026-09-08
Municipal Business Licence — Building ContractorCity of Birmingham Finance Department, Tax and License Administration DivisionSchedule 068, graduated by prior-year gross receipts from work performed inside city limits: under $50,000 $250, rising in steps to $1,500 at $1,500,000–$2,000,000, then plus 0.1% of the excess above $2,000,000, capped at a $25,000 maximum tax. A contractor with an office in the city but no work performed there pays a flat $350.annual — calendar year2026-09-08
Commercial Building PermitCity of Birmingham Department of Planning, Engineering and Permits$9.50 per $1,000 of valuation for the building permit itself, and identically for HVAC, sprinkler/fire detection, awnings, and parking lot installation; plumbing, gas, electrical and mechanical permits are the same $9.50 per $1,000 with a $125 minimum each. Plan review (commercial): $150 up to $10,000 valuation, $350 for $10,001–$50,000, $700 for $50,001–$100,000, then $700 plus $1.50 per $1,000 above $100,001. A $1.00 per $1,000 state craft-training-fund surcharge applies to nonresidential permits. Reinspection is $125; weekend/after-hours inspection is a $300 minimum for the first four hours.one-time, per project2026-09-08
State and County Business Privilege Licenceonly if it applies to youAlabama Department of Revenue, Business and License Tax DivisionPriced trade by trade — a restaurant by town population and seats from $8.50 to $76, a garage by headcount, a barber shop by chairs, a contractor by contract value to $376 — plus 50% for the county and a $1 issuance feeannual — 1 October to 30 September, delinquent 1 November2026-09-03
Certificate of Formation (LLC)only if it applies to youAlabama Secretary of State, Business Services$200 one-time filingperpetual — Alabama abolished the annual report in 20242026-09-03
Certificate of Incorporationonly if it applies to youAlabama Secretary of State, Business Services$200 one-time filingperpetual — Alabama abolished the annual report in 20242026-09-03
Corporation Annual Report (abolished)only if it applies to youAlabama Secretary of State, Business ServicesNo feenot applicable — the filing no longer exists2026-09-03
Business Privilege Taxonly if it applies to youAlabama Department of Revenue, Sales and Use Tax DivisionNothing at all where the computed tax is $100 or less, and no return is due; above that, $0.25 to $1.75 per $1,000 of Alabama net worth, capped at $15,000 for most entitiesannual — due when the matching federal return is due2026-09-03
General Contractor Licenceonly if it applies to youAlabama State Licensing Board for General Contractors$300 new application; renewal is $200, and a subcontractor pays half of each12 months, on a staggered schedule keyed to the first letter of the company name2026-09-03
Residential Home Builder Licenceonly if it applies to youAlabama Home Builders Licensure Board$250 a year, being the $235 licence and $15 recovery fund fee; $100 more in the first yearcalendar year — renewal opens 1 October and is late after 30 November2026-09-03

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

How much does it actually cost to permit a contractor or trade in Birmingham?

There is no single figure, and any site quoting one is rounding away the part that matters. Of the 10 records listed for a contractor or trade in Birmingham, AL, 2 apply to every business of this type and 8 are conditional. Adding every fee on the page together would overstate what most operators pay, because it would include permits they never need.

5 of the 10 are charged as a range or a formula set by the issuing agency, and 1 has no fee published at all. The ones that vary:

Zoning Certificate or Information Letter: $50–$100 a Zoning Certificate Letter (zoning classification and flood plain status only) is $50; a more detailed Zoning Information Letter is $100 or more depending on scope

Municipal Business Licence — Building Contractor: Schedule 068, graduated by prior-year gross receipts from work performed inside city limits: under $50,000 $250, rising in steps to $1,500 at $1,500,000–$2,000,000, then plus 0.1% of the excess above $2,000,000, capped at a $25,000 maximum tax. A contractor with an office in the city but no work performed there pays a flat $350.

Commercial Building Permit: $9.50 per $1,000 of valuation for the building permit itself, and identically for HVAC, sprinkler/fire detection, awnings, and parking lot installation; plumbing, gas, electrical and mechanical permits are the same $9.50 per $1,000 with a $125 minimum each. Plan review (commercial): $150 up to $10,000 valuation, $350 for $10,001–$50,000, $700 for $50,001–$100,000, then $700 plus $1.50 per $1,000 above $100,001. A $1.00 per $1,000 state craft-training-fund surcharge applies to nonresidential permits. Reinspection is $125; weekend/after-hours inspection is a $300 minimum for the first four hours.

State and County Business Privilege Licence: Priced trade by trade — a restaurant by town population and seats from $8.50 to $76, a garage by headcount, a barber shop by chairs, a contractor by contract value to $376 — plus 50% for the county and a $1 issuance fee

Business Privilege Tax: Nothing at all where the computed tax is $100 or less, and no return is due; above that, $0.25 to $1.75 per $1,000 of Alabama net worth, capped at $15,000 for most entities

Which offices issue these permits in Birmingham?

Permits for a contractor or trade in Birmingham, AL come from 7 separate offices: City of Birmingham Department of Planning, Engineering and Permits, City of Birmingham Finance Department, Tax and License Administration Division, Alabama Department of Revenue, Business and License Tax Division, Alabama Secretary of State, Business Services, Alabama Department of Revenue, Sales and Use Tax Division, Alabama State Licensing Board for General Contractors, Alabama Home Builders Licensure Board. No single office issues them all, which is why an opening means filing in several places rather than one.

Is anything about these requirements changing?

The city's own request form does not state whether this letter is a mandatory prerequisite to opening or an optional due-diligence document a business can request; several municipal business licence schedules (auto repair, parking, junk yards) do separately condition licence issuance on zoning sign-off from this department. Confirm with the Zoning Division (205-254-2478) before treating this as a required step for every business type.

On top of, not instead of, the state general contractor or home builder board licence recorded at the state layer.

A citywide minimum permit fee of $125 applies regardless of the calculated amount for any individual trade permit.

This is the licence people mean when they say Alabama has a state business licence, and it has no single price because the statute enumerates business types one by one — around a hundred and twenty of them — each with its own schedule. A restaurant is banded by the population of the town and then by seats, running from $8.50 in a small town with ten seats to $76 in a city over forty thousand with more than thirty-five. A garage pays by the number of men, a barber shop by the number of chairs, a beauty parlour by the number of operators, a contractor by the value of the contract. Whatever the state levies, the county adds fifty per cent, and a $1 issuance fee goes on top of the first line. Three things trip people up. It is a tax licence, not a competence test — it sits on top of any professional board licence and replaces none of them, and the county need not even see the board certificate. It is needed in every county you do business in, and generally for each location. And a business that operates in more than one category needs more than one. New businesses starting after 1 April pay a half-year rate; renewals never do.

Two hundred dollars, of which the Secretary of State passes $100 to the treasurer of the county where the registered agent sits — which is why older material describes a two-stage filing. Since 1 January 2021 you file directly with the Secretary of State and pay nothing separately to the probate judge. Watch for stale forms: two older PDFs are still live on the Secretary of State's own site and both instruct filers to mail the document to the probate judge with a $100 fee. A name reservation is a prerequisite and costs $25 by post or $28 online. A corporation costs the same $200.

The same $200 as an LLC, with the same $100 passed to the county treasurer. Alabama calls this a certificate of incorporation rather than articles, following the title 10A-2A recodification, and calls the LLC equivalent a certificate of formation. Amendments and dissolutions are $100 each; registering a foreign entity is $150.

No fee, because the filing was abolished — the Secretary of State states plainly that corporations authorised to transact business in Alabama are no longer required by law to file an annual report. It cost $10 and disappeared on 1 October 2024. The history is worth knowing because it explains the confusion: the report used to ride along with the business privilege tax return, was detached into a standalone $10 filing at the start of 2024 when the minimum tax went, and was then repealed outright nine months later. One live trap remains — the revenue department's forms CPT and PPT are still titled business privilege tax return and annual report, and that internal annual report is a different thing that has not been abolished.

Alabama used to charge every entity a $100 minimum whether or not it had made a penny. That minimum was phased down to $50 for 2023 and to nothing from tax year 2024, and the exemption is total: where the computed tax is $100 or less there is no tax and no return. Above the threshold the tax is real — a rate per thousand dollars of Alabama net worth, set by a band keyed to apportioned federal taxable income, capped at $15,000 for most entities, $3 million for financial institution groups and insurers paying premium tax, and $500 for an electing family limited liability entity. A new entity files an initial return within two and a half months of organising, but again only if the tax computes above $100.

The threshold moved on 1 October 2024 and a lot of published material has not caught up: the licence is required where the cost of the undertaking is $100,000 or more, raised from $50,000, and the same figure applies to public and private work and to subcontractors. Swimming pools have their own much lower trigger at $5,000. Two official documents still say $50,000 — the board's own rule 230-X-1-.09 and its 2022 subcontractor instructions — and the statute controls. A subcontractor pays exactly half of everything: $150 new and $100 to renew against $300 and $200. Renewing more than ninety days late costs another $50. Your bid limit is set from your financial statement at ten times the lesser of net worth or working capital, which sorts licensees into classes from $100,000 up to unlimited. Residential work belongs to the Home Builders board instead, and the privilege licence banded by contract value is owed on top.

Residential building is a separate board with a much lower trigger than the general contractor one: $10,000 for building work and just $2,500 for residential roofing. Two hundred and fifty dollars a year covers the $235 licence and the $15 homeowners' recovery fund contribution, with $100 more for a new applicant's first year; a roofing-only licence is $150 with no recovery fund fee. The boundary between the two boards is jurisdictional rather than financial — the general contractor statute exempts residences and private dwellings, and this board's remit stops at structures no more than three floors high with no more than four residential units, above which it reverts. There is a grandfathering quirk worth checking: general contractor licence numbers up to 18907, issued before this board existed in 1992, may still do residential work, while 18908 and above may not. The three tiers turn on scope, not money — a single trade not affecting structural integrity is limited, anything structural or spanning trades is unlimited, and roofing has its own class with a $10,000 bond and no examination.

Sources

Every figure above was read from one of these government pages on the date shown. Confirmed by Editorial Team.

  1. City of Birmingham — Zoning Letter Request Form and feesCity of Birmingham, Department of Planning, Engineering and Permits · primary source · retrieved 2026-09-08
  2. City of Birmingham Business Licence Code, Ordinance 97-183 as amended, listing of schedules by number (hosted by the Alabama Department of Revenue)City of Birmingham, republished by the Alabama Department of Revenue · primary source · retrieved 2026-09-08
  3. City of Birmingham — Permit and Inspection Fees, articles V and VIICity of Birmingham, Department of Planning, Engineering and Permits · primary source · retrieved 2026-09-08
  4. Alabama Department of Revenue — Handbook of Privilege and Store Licenses, October 2022, with the fee schedule for each business typeAlabama Department of Revenue · primary source · retrieved 2026-09-03
  5. Alabama Department of Revenue — business privilege licence briefing, on the $1 issuance fee and county-by-county issuanceAlabama Department of Revenue · primary source · retrieved 2026-09-03
  6. Alabama Secretary of State — domestic LLC certificate of formation, showing the $200 fee and the $100 remitted to the countyAlabama Secretary of State · primary source · retrieved 2026-09-03
  7. Alabama Secretary of State — filing fee schedule, revised 23 August 2023Alabama Secretary of State · primary source · retrieved 2026-09-03
  8. Alabama Secretary of State — domestic entity name reservation request formAlabama Secretary of State · primary source · retrieved 2026-09-03
  9. Alabama Secretary of State — domestic business corporation certificate of incorporationAlabama Secretary of State · primary source · retrieved 2026-09-03
  10. Alabama Secretary of State — business entities page, stating corporations no longer file an annual reportAlabama Secretary of State · primary source · retrieved 2026-09-03
  11. Alabama Department of Revenue — notice on the full exemption from business privilege tax where the tax due is $100 or lessAlabama Department of Revenue · primary source · retrieved 2026-09-03
  12. Alabama Department of Revenue — 2026 business privilege tax quick preparation reference, confirming no filing requirement below the $100 thresholdAlabama Department of Revenue · primary source · retrieved 2026-09-03
  13. Alabama State Licensing Board for General Contractors — renewal information and current feesAlabama State Licensing Board for General Contractors · primary source · retrieved 2026-09-03
  14. Alabama Act 2024-277 as enrolled — raising the general contractor licensing threshold to $100,000 from 1 October 2024Alabama Legislature · primary source · retrieved 2026-09-03
  15. Alabama Administrative Code rule 465-X-4-.04 — Home Builders Licensure Board fee schedule, effective 17 March 2025Alabama Home Builders Licensure Board · primary source · retrieved 2026-09-03