City of Minneapolis, Construction Code Services

In short

City of Minneapolis, Construction Code Services issues 3 permits we publish for Minneapolis, last verified 2026-09-08. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Certificate of OccupancyCity of Minneapolis, Construction Code ServicesNo feerequired before occupying a new building or a new use of an existing one (MSBC section 1300.0220)2026-09-08
Commercial Building PermitCity of Minneapolis, Construction Code ServicesTotal Permit Fee = Building Permit Fee + Plan Review Fee (65% of the building permit fee) + Minnesota State Surcharge (0.05% of the value of work). A minimum fee of $84.20 applies to residential or commercial permits (excluding the state surcharge). Building permit fee by valuation: $36.70 up to $500 (minimum fee applies); $36.70 + $4.50 per $100 to $2,000; $104.20 + $20.60/$1,000 to $25,000; $578.00 + $14.90/$1,000 to $50,000; $950.50 + $10.60/$1,000 to $100,000; $1,480.50 + $8.40/$1,000 to $500,000; $4,840.50 + $6.90/$1,000 to $1,000,000; $8,290.50 + $5.60/$1,000 above that.one-time, per project2026-09-08
Sign PermitCity of Minneapolis, Construction Code ServicesOn-premises permanent sign $215; on-premises temporary sign $50; off-premises advertising sign $1,250. A $1.00 Minnesota State Surcharge is added on top of each.one-time, per sign2026-09-08

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

Certificate of Occupancy

Quoted directly: 'There is no fee for a certificate of occupancy inspection. Penalty fees may apply if re-inspection is necessary.' A Temporary Certificate of Occupancy carries a separate fee 'as stated in the current Director's Fee Schedule' — the city's Certificate of Occupancy Policy references that rate-setting document by name without printing a dollar figure for it, and no standalone copy of the Director's Fee Schedule is published elsewhere on minneapolismn.gov.

Commercial Building Permit

The City's Building Permit Fee Schedule has one valuation-based table, with no separate tenant-buildout table, so the same schedule applies to tenant improvements and alterations. Construction value is determined under Minnesota Rule 1300.0160 subp. 3, the City's bulletin 058 and Minneapolis Code of Ordinances Section 91.220, as the schedule states.

Sign Permit

The City's Sign Fee Schedule prices on-premises permanent signs at $215.00, temporary signs at $50.00 and off-premises advertising signs at $1,250.00, and states the fee does not include the $1.00 Minnesota State Surcharge. The installer must separately hold a Sign Hanger license, priced at $200 in the City's 2026 License Fees list.

Contact

Jurisdiction
Minneapolis
Phone
(612) 673-2327

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. City of Minneapolis — Certificate of Occupancy Policy 2014-01 (revised November 2024)City of Minneapolis Construction Code Services · primary source · retrieved 2026-09-08
  2. Minneapolis Building Permit Fee ScheduleCity of Minneapolis Construction Code Services · primary source · retrieved 2026-09-08
  3. Minneapolis Sign Fee ScheduleCity of Minneapolis Construction Code Services · primary source · retrieved 2026-09-08

Other offices serving Minneapolis

The full permit list for this jurisdiction

Industry permit lists that include this agency

Minnesota jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.