New York
New York City Department of Buildings
In short
New York City Department of Buildings issues 3 permits we publish for New York, last verified 2026-09-05. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.
What this agency issues
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Certificate of Occupancy | New York City Department of Buildings | $100 does not include a separate filing fee | no fixed expiration — a new certificate is required whenever use or occupancy changes | 2026-09-05 |
| Sign Permit | New York City Department of Buildings | The filing fee is the same variable alteration-permit fee that applies to the building (see the Commercial Building Alteration Permit record), plus a flat signage surcharge on top: $5.00 per 100 sq ft of surface area or fraction (minimum $35.00) for a ground or wall sign; $15.00 per 100 sq ft (minimum $70.00) for a closed-surface roof sign; $15.00 per 100 sq ft (minimum $130.00) for an open-surface roof sign up to 31 feet above roof level; $25.00 per 100 sq ft (minimum $135.00) above that height. An illuminated sign projecting beyond the building line owes a further, separate ANNUAL use fee on top of the one-time filing fee: $45.00 a year for 30 sq ft or less, $70.00 for 31 to 50 sq ft, or $0.75 per sq ft (minimum $130.00) above 50 sq ft. | one-time for the sign filing itself; an illuminated sign extending beyond the building line separately owes the annual use fee above for as long as it stands | 2026-09-05 |
| Commercial Building Alteration Permit | New York City Department of Buildings | For a commercial building or structure under 7 stories and under 100,000 square feet (Table 28-112.2, Item 12): a minimum filing fee of $280 (Alteration Type 1), $225 (Alteration Type 2), or $195 (Alteration Type 3 or a Limited Alteration Application) for the first $3,000 of alteration cost, plus $10.30 for each further $1,000 or fraction of alteration cost above $3,000. Renewal is $130 per work type. A building 7 or more stories or 100,000+ square feet instead pays a $290 minimum plus $17.75 per $1,000 above $3,000 (Item 14). A one-, two- or three-family dwelling instead pays a $130–$170 minimum plus $2.60 per $1,000 above $5,000 (Item 11). | one-time per permit; a $130 renewal applies per work type if the permit lapses before work is complete | 2026-09-05 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
About each permit
Certificate of Occupancy
Required for a new building, and for an existing one whenever there is a change in use, exit routes or occupancy type. The $100 figure is stated on the City's own official service platform; the underlying Administrative Code section itself defers to DOB rule rather than stating the dollar amount directly in the statute text.
Sign Permit
Confirmed directly against the current Administrative Code fee table, which finally gives real numbers after an earlier pass found only that a sign filing is priced as an Alteration work type with no flat figure — true of the base alteration fee, but the signage-specific surcharge and the illuminated-sign annual fee are both flat and now confirmed. A sign smaller than six square feet and not illuminated needs no permit at all. A sign attached to a structure that is not directly on the building's wall or facade also needs a separate alteration permit for that structure, and one with an electrical connection needs its own separate electrical work permit from a licensed electrician.
Commercial Building Alteration Permit
Confirmed directly against the current Administrative Code text — not the 2016 Local Law 56 service-update notice, and not an unofficial code mirror found to still be showing pre-2016 figures, both of which were ruled out first. Local Law 128 of 2024 raised the minimum filing fee that used to be $100 across nearly every item in this table to $130. For work resulting in a new or changed Certificate of Occupancy, only 50% of the fee (minimum $130) is due at first filing, with the remainder due before the permit issues; other work pays the full fee (minimum $130) at filing.
Contact
- Jurisdiction
- New York
- Phone
- Not verified — use the website
Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.
Sources
Every fee and term above was read from one of these government pages on the date shown.
- New York City — Certificate of OccupancyNew York City Department of Small Business Services · primary source · retrieved 2026-09-04
- New York City Administrative Code section 28-112.2, Schedule of Permit Fees (Table 28-112.2) — current text, amended through Local Law 128 of 2024, effective December 21, 2025; content supplied directly by the requester after this host returned 403 to every automated attemptAmerican Legal Publishing (New York City Administrative Code) · primary source · retrieved 2026-09-05
- New York City Administrative Code section 28-112.2.1, Permits for other than electrical work — confirms the $130 payment floor and filing-timing rule, current through Local Law 128 of 2024American Legal Publishing (New York City Administrative Code) · primary source · retrieved 2026-09-05
- New York City Department of Buildings — Sign Permit requirements, exceptions and illuminated-sign rulesNew York City Department of Buildings · primary source · retrieved 2026-09-05
Other offices serving New York
The full permit list for this jurisdiction
Industry permit lists that include this agency
New York jurisdictions