Cobb County
Cobb County Community Development, Development & Inspections Division
In short
Cobb County Community Development, Development & Inspections Division issues 1 permit we publish for Cobb County, last verified 2026-10-02. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.
What this agency issues
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Building Permit / Land Disturbance Permitonly if it applies to you | Cobb County Community Development, Development & Inspections Division | Residential: $6.00 per $1,000 of ICC Building Valuation Data construction cost over $75,000, with flat fees below that threshold (up to $15,000 $80; $15,001-25,000 $150; $25,001-50,000 $300; $50,001-75,000 $450). Commercial/multifamily: $7.00 per $1,000 of construction cost over $75,000, with flat fees below that threshold ($100/$175/$350/$525 across the same bands). Other fees applying across permit types: Certificate of Occupancy or Letter of Completion $50.00 (new homes); technology fee $15.00; site plan review $100.00; revision $50.00 (residential) or $150.00 minor/$500.00 major (commercial); permit renewal $100.00 (residential) or $250.00 (commercial, approval required); reinspection $50.00/$75.00/$100.00 for the first, second, and third-and-later reinspection; pools $250.00 minimum; trade permit (electrical, plumbing, HVAC, or gas) $80.00; demolition or retaining wall $100.00; demolition historical-review fee $50.00; power-reconnect-only $80.00; a temporary certificate of occupancy (subject to approval) $500.00, valid a maximum of 30 days; a double-permit-fee penalty, maximum $1,000.00, applies to construction begun before the permit issues. Land Disturbance Permit: single-family $50.00 per lot, minimum $250.00, plus $40.00 per disturbed acre under NPDES (charged once per project, only if over one acre is disturbed); commercial/townhome $200.00 per disturbed acre plus the same $40.00-per-acre NPDES charge; plat review $150.00; weekly plan review $250.00 per submittal; final plat revision review $80.00. | per project | 2026-10-02 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
About each permit
Building Permit / Land Disturbance Permit
This permit applies only inside unincorporated Cobb County; a project inside any of the county's seven incorporated cities is permitted by that city's own office instead. The $6.00/$1,000 (residential) and $7.00/$1,000 (commercial) valuation multipliers and the flat tiers above are current, effective July 1, 2024, with no newer standalone schedule superseding them. The schedule document's own illustrative heated- and unheated-square-foot dollar figures are not reproduced here, because the schedule's own text states that 'Building permit fees will be updated annually to reflect the current published ICC chart' — meaning the underlying International Code Council valuation table used to translate square footage into a dollar construction cost refreshes every January, and a newer vintage of that table may already be in use in October 2026. A permit applicant should obtain the current ICC valuation directly from Development & Inspections rather than rely on any older illustration of it.
Contact
- Jurisdiction
- Cobb County
- Phone
- Not verified — use the website
Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.
Sources
Every fee and term above was read from one of these government pages on the date shown.
- Cobb County Development & Inspections, Building Permit Fee Schedule, effective July 1, 2024Cobb County Development & Inspections · primary source · retrieved 2026-10-02
Other offices serving Cobb County
The full permit list for this jurisdiction
Industry permit lists that include this agency
Georgia jurisdictions
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.
