Commercial Compliance Hub

Tucson

City of Tucson Planning & Development Services Department

In short

City of Tucson Planning & Development Services Department issues 3 permits we publish for Tucson, last verified 2026-09-05. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Certificate of OccupancyCity of Tucson Planning & Development Services Department$70.62 for a Certificate of Occupancy at an address with no permit issued in the prior 360 days. A Temporary Certificate of Occupancy is $695.50, valid 30 days; renewing it is $267.50, also valid 30 days.issued once per qualifying occupancy; a temporary certificate runs 30 days2026-09-05
Commercial Building/Alteration PermitCity of Tucson Planning & Development Services DepartmentValuation is set by the signed construction contract, or, absent one, as a percentage of full building valuation by IEBC alteration level — 5% for Level 1 (removal/replacement of existing materials/fixtures), 20% for Level 2 (reconfiguring space, doors, windows, systems), 35% for Level 3 (work area over 50% of the building). That valuation runs through the fee table: $89.45 flat up to $2,000; $89.45 + $22.95 per $1,000 from $2,000.01–$25,000; $617.30 + $16.83/$1,000 to $50,000; $1,038.05 + $9.64/$1,000 to $100,000; $1,520.05 + $8.25/$1,000 to $500,000; $4,800.05 + $7.45/$1,000 to $1,000,000; $8,525.05 + $5.45/$1,000 above that. A Building Staff Review fee of 65% of the permit fee applies, plus a Fire Review of 2.5% (staff) and 2% (inspections) of the permit fee for commercial alterations.one-time, per project2026-09-05
Sign PermitCity of Tucson Planning & Development Services DepartmentBy sign valuation: $88.28 ($1–$2,000), $132.41 ($2,000.01–$5,000), $176.55 ($5,000.01–$8,000), $264.83 ($8,000.01–$12,000), $353.10 ($12,000.01–$15,000), $397.24 ($15,000.01–$20,000), $441.38 ($20,000.01–$30,000), $485.51 ($30,000.01–$40,000), $662.06 (above $40,000). A separate staff review fee also applies: $353.10 for 1–10 signs, $617.93 for more than 10, $264.83 for a sign repair, $88.28 for a change of copy.one-time, per sign2026-09-05

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

Certificate of Occupancy

A separate, still-published Temporary Certificate of Occupancy intake form states a flat $500 fee — that form appears stale relative to this Mayor & Council-adopted master fee schedule, which took effect July 1, 2026, and is used here as the authoritative, current figure.

Commercial Building/Alteration Permit

For new commercial construction (not an alteration), the fire staff-review rate is 3% rather than 2.5%.

Sign Permit

A standalone 'Permanent Sign Fees' PDF dated October 2022 shows lower, now-superseded figures and should not be used.

Contact

Jurisdiction
Tucson
Phone
Not verified — use the website

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. City of Tucson — Year Two Revised Development Review Fee Schedule (effective July 1, 2026)City of Tucson, Planning & Development Services Department · primary source · retrieved 2026-09-05

Other offices serving Tucson

The full permit list for this jurisdiction

Industry permit lists that include this agency

Arizona jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.