Morgan County
Morgan County Engineer's Office / Highway Department
In short
Morgan County Engineer's Office / Highway Department issues 1 permit we publish for Morgan County, last verified 2026-09-28. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.
What this agency issues
| Permit | Issuing agency | Fee | Renews | Last checked |
|---|---|---|---|---|
| Unincorporated Development Permits (Floodplain / Septic / Driveway)only if it applies to you | Morgan County Engineer's Office / Highway Department | The Morgan County Engineer's office describes three permits as mandatory for most development in unincorporated Morgan County: a floodplain permit (a floodplain determination is required before applying for a sewage disposal permit), a sewage disposal (septic tank) permit from the Morgan County Health Department, and a driveway permit from the Highway Department or County Engineer's office for work on a county road. No dollar fee figure for any of the three permits themselves is published in the source material used for this record. Failure to obtain all required permits before construction begins triggers a flat $300.00 penalty. | one-time, per development project in unincorporated Morgan County | 2026-09-28 |
Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.
About each permit
Unincorporated Development Permits (Floodplain / Septic / Driveway)
Under the Code of Alabama, §45-52-260, captioned 'Zoning and Planning,' is the sole section of Article 26 of the county's local acts, and its entire text reads only 'Reserved', so the Code provides no county-level zoning ordinance. Under that Code section, with no county zoning or building-permit system to fall back on, a contractor developing land in unincorporated Morgan County instead needs three separate, real permits that the County Engineer's office itself describes as mandatory and 'imposed by State and Federal law,' not optional: a floodplain permit (a floodplain determination must be completed before a sewage disposal permit application), a sewage disposal/septic tank permit issued by the Morgan County Health Department, and a driveway permit for access onto a county road, from the Highway Department or the County Engineer's office. None of the three permit fees themselves is published in any source used for this record. What is published and confirmed is the consequence of skipping them: a flat $300.00 penalty applies if construction begins before all required permits are obtained. This record applies to unincorporated Morgan County; incorporated cities such as Decatur and Hartselle run their own separate municipal building-permit processes, not covered here.
Contact
- Jurisdiction
- Morgan County
- Phone
- (256) 962-2041 (Highway Department); (256) 962-3171 (County Engineer's Office)
- Website
- morgancoengineer.org/
Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.
Sources
Every fee and term above was read from one of these government pages on the date shown.
- Code of Alabama §45-52-260 — 'Zoning and Planning,' the sole section of Article 26, reads only 'Reserved'; no county zoning ordinance existsJustia / Code of Alabama 1975 · primary source · retrieved 2026-09-28
- Development in Morgan County — floodplain, sewage disposal (septic tank), and driveway permit requirements, and the $300.00 penalty for failing to obtain them before construction beginsMorgan County Engineer's Office · primary source · retrieved 2026-09-28
Other offices serving Morgan County
The full permit list for this jurisdiction
Industry permit lists that include this agency
Alabama jurisdictions
Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.
