Commercial Compliance Hub

Mobile

City of Mobile Building, Engineering and Environmental Services (Build Mobile)

In short

City of Mobile Building, Engineering and Environmental Services (Build Mobile) issues 3 permits we publish for Mobile, last verified 2026-09-08. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Certificate of OccupancyCity of Mobile Building, Engineering and Environmental Services (Build Mobile)$100 a temporary Certificate of Occupancy, or a change of occupancy where no work is performed and no permit is issued; no separate fee where a building permit is already being issued for the same workone-time, per issuance2026-09-08
Conditional Use Permit or Special Exceptiononly if it applies to youCity of Mobile Building, Engineering and Environmental Services (Build Mobile)$500 a Planning Commission Conditional Use Permit; a Board of Zoning Adjustment Special Exception is the same $500 for a commercial application ($250 residential), plus postage and legal-ad costs billed separatelyone-time, per request2026-09-08
Commercial Building PermitCity of Mobile Building, Engineering and Environmental Services (Build Mobile)$5.50 per $1,000 of valuation for the first $50,000, then $4.50 per $1,000 above that, for new construction, additions, alterations and repairs alike (a $25 minimum applies, with no fee at all for $1,000 or under unless an inspection is required). Commercial valuation is set from the construction contract or notarized documentation rather than a fixed per-square-foot table. Plan review is a $100 base, escalating to $200, $500, $1,000 and $2,000 on repeated re-submittals. Reinspection is $50/$75/$100 for the first, second and third-or-later visit; weekend or after-hours inspection is $200 for up to four hours.one-time, per project2026-09-08

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

Certificate of Occupancy

Zoning, tree, fire-final and engineering as-built sign-offs are all required before either a Certificate of Occupancy or a Temporary Certificate of Occupancy issues.

Conditional Use Permit or Special Exception

Only triggered where the zoning district does not already permit the intended use as of right — the Unified Development Code's use table lists veterinary clinics and day care facilities among the uses that can require this step in some districts. A routine business opening in an already-correctly-zoned space instead only needs the no-cost Zoning Approval Certificate; confirm with Planning and Zoning (251-208-5895) whether a specific address and use actually requires this permit before budgeting for it.

Commercial Building Permit

Cite buildmobile.org, not cityofmobile.gov's own /pdf/permit_fee_schedule.pdf link — that city-hosted copy still serves the superseded 2006 ordinance this 2022 ordinance replaced. The dollar figures matched where compared, but buildmobile.org is the current, legally operative source.

Contact

Jurisdiction
Mobile
Phone
(251) 208-5895

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. City of Mobile — Board of Zoning Adjustment Application and fee scheduleCity of Mobile, Build Mobile · primary source · retrieved 2026-09-08
  2. City of Mobile — Building Codes Permit Fee Schedule Ordinance 28-052, adopted November 8, 2022City of Mobile, Build Mobile · primary source · retrieved 2026-09-08
  3. City of Mobile — Commercial Certificate of Occupancy FAQ, February 2024City of Mobile, Build Mobile · primary source · retrieved 2026-09-08
  4. City of Mobile — Planning Commission Application and fee schedule, revised October 2025City of Mobile, Build Mobile · primary source · retrieved 2026-09-08

Other offices serving Mobile

The full permit list for this jurisdiction

Industry permit lists that include this agency

Alabama jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.