Commercial Compliance Hub

Knoxville

City of Knoxville Plans Review & Inspections

In short

City of Knoxville Plans Review & Inspections issues 3 permits we publish for Knoxville, last verified 2026-09-05. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Certificate of OccupancyCity of Knoxville Plans Review & InspectionsReissuing a Certificate of Occupancy where no work was performed costs $100. A Zoning Compliance letter issued without a Certificate of Occupancy is $100 (non-residential) or $50 (residential).issued once per qualifying occupancy2026-09-05
Commercial Building PermitCity of Knoxville Plans Review & InspectionsBuilding permit: 0.55% of valuation, $50 minimum, up to $500,000; $2,750 + 0.45% of the amount over $500,000 up to $2M; $9,500 + 0.35% over $2M up to $20M; $72,500 + 0.25% over $20M. Plan review runs alongside it at 0.1% of valuation ($50 min) up to $500,000, then $500 + 0.075% to $2M, $1,625 + 0.05% to $20M, $10,625 + 0.025% above that. A trade permit (mechanical/electrical/plumbing) tied to the building permit is billed at the greater of 0.15% of total project valuation or 0.5% of the trade's own valuation, $55 minimum; a stand-alone trade permit is 0.5% of its valuation, $55 minimum. Reinspection is $50 (the first is free); a permit renewal is 25% of the original fee, $50–$1,000.one-time, per project2026-09-05
Sign PermitCity of Knoxville Plans Review & Inspections$75 sign review fee, plus a permit fee of 0.5% of project valuation, $200 minimum.one-time, per sign2026-09-05

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

Certificate of Occupancy

The Development Services Fee Schedule 2024 was checked in full for a standalone Certificate of Occupancy line and has none — it prices only a reissuance ($100, where no work was performed) and a Zoning Compliance letter issued without a certificate ($100 non-residential, $50 residential). An initial Certificate of Occupancy most likely rides on the building-permit and final-inspection fee already charged for the underlying project rather than billing again on its own, though the schedule does not spell that out directly.

Commercial Building Permit

Knox County's own fee schedule uses a different valuation table and applies only to unincorporated county areas outside Knoxville city limits.

Sign Permit

An earlier web-search synthesis of this fee garbled it into a single '$75 + $5/$1,000' formula — that is incorrect; the two-part review-plus-permit structure above comes from a direct read of the city's own current PDF.

Contact

Jurisdiction
Knoxville
Phone
(865) 215-4311

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. City of Knoxville — Development Services Fee Schedule 2024City of Knoxville, Plans Review & Inspections · primary source · retrieved 2026-09-05

Other offices serving Knoxville

The full permit list for this jurisdiction

Industry permit lists that include this agency

Tennessee jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.