Commercial Compliance Hub

Greenville County

Greenville County Land Development Division

In short

Greenville County Land Development Division issues 1 permit we publish for Greenville County, last verified 2026-10-12. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
Grading / Land-Disturbance Permit (Greenville County Land Development Division)only if it applies to youGreenville County Land Development DivisionLand Development Division Fee Schedule, Grading Permits Fees (as of 07/01/2025): Simplified Plan Fee (Commercial Only), 1-year permit, $750; Engineered Minimum Fee, 2-year permit, $2,200 + $100 per disturbed acre; Full Land Permit, 2-year permit, $3,000 + $100 per disturbed acre, or 5-year permit, $4,500 + $100 per disturbed acre. Renewals: Simplified 1-year $150; Engineer Minimum or Full Land 1-year $1,250, 2-year $2,500. Unauthorized Land Disturbance Activities Fee (Stop Work Order Fee) $750 per lot.1-year (Simplified), 2-year (Engineered Minimum or Full Land) or 5-year (Full Land) permit; renewable2026-10-12

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

Grading / Land-Disturbance Permit (Greenville County Land Development Division)

The county's Commercial Permitting FAQ states that grading permits "May be required if there is any land disturbance, paving, gravel or structures placed on site", and that an approved set of Land Development plans or a statement of exemption is required with every building plan review submittal (Land Development questions: 864-467-4610). The fees are those of the Land Development Division Fee Schedule, "Grading Permits Fees (as of 07/01/2025)", linked from the Division's page as "LDD Fee Schedule - 07/01/25". The Simplified Plan Fee (Commercial Only), for non-residential sites disturbing more than 5,000 sq. ft. but generating less than 1 CFS of flow that do not need an engineered plan, is $750 for a 1-year permit. The Engineered Minimum Fee is $2,200 plus $100 per disturbed acre for a 2-year permit. The Full Land Permit is $3,000 plus $100 per disturbed acre for a 2-year permit, or $4,500 plus $100 per disturbed acre for a 5-year permit (the 5-year permit is required for combo reviews). Renewals are $150 for a 1-year Simplified renewal, and $1,250 (1-year) or $2,500 (2-year) for an Engineer Minimum or Full Land renewal. Unauthorized land disturbance draws a Stop Work Order Fee of $750 per lot, which may be issued along with the grading permit fees and any tickets or fines.

Contact

Jurisdiction
Greenville County
Phone
(864) 467-4610

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. Commercial Permitting: General Requirements and Frequently Asked QuestionsGreenville County Planning and Code Compliance · primary source · retrieved 2026-10-12
  2. Land Development Division Fee Schedule: Grading Permits Fees (as of 07/01/2025)Greenville County Land Development Division · primary source · retrieved 2026-10-12
  3. Land Development Division pageGreenville County Land Development Division · primary source · retrieved 2026-10-12

Other offices serving Greenville County

The full permit list for this jurisdiction

Industry permit lists that include this agency

South Carolina jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.