Commercial Compliance Hub

St. Louis County

St. Louis County Planning & Zoning — Onsite Wastewater Division

In short

St. Louis County Planning & Zoning — Onsite Wastewater Division issues 1 permit we publish for St. Louis County, last verified 2026-10-13. Each carries the fee as the agency publishes it, with a link to the schedule it was read from.

What this agency issues

Permits required, with issuing agency, fee, renewal term and the date each record was last verified against its source
SSTS (Septic) Permit to Construct and Operating Permitonly if it applies to youSt. Louis County Planning & Zoning — Onsite Wastewater DivisionPermit to construct, commercial or multiple dwellings under 2,500 gallons per day, by system type: Type I non-shoreland $340, shoreland $595; Type II holding tank $285, privy $115, floodplain $345; Type III $385; Type IV $440; Type V $550; component addition or replacement $225. Commercial or multiple dwellings over 2,500 gallons per day $840. Operating permit renewal (Types II to V) $70. Late fee two times the regular fee.permit to construct per project; operating permit renewed on the county's renewal cycle2026-10-13

Fees shown as a range or formula are set that way by the issuing agency — we do not average them into a single number.

About each permit

SSTS (Septic) Permit to Construct and Operating Permit

A business whose premises are served by a subsurface sewage treatment system (septic system) rather than a public sewer needs a permit to construct before a new or replacement system is installed, and some system types carry an operating permit that is renewed with Form 3040 and a $70 fee; a business on a public sewer has no septic permit. The county's Onsite Wastewater Division page states that the division "is responsible for the administration and coordination of onsite wastewater treatment systems throughout St. Louis County" and regulates Ordinance 61. Minn. R. 7082.0040 subp. 2 states that county SSTS ordinances "must apply to all land area within the county, except in towns and cities that have adopted ordinances that are in conformance with the county ordinance and this chapter," so a site in a town or city with its own conforming SSTS ordinance applies there instead. Commercial applications use Form 3001 (Rev. 12-30-2025), which prints the same type-by-type fees and states "Please make checks payable to: St. Louis County Auditor." The figure is from the St. Louis County 2026 Fee Schedule (amended by the County Board after the public hearing on January 27, 2026; originally adopted November 4, 2025 by Resolution No. 25-527), which is in effect through December 31, 2026.

Contact

Jurisdiction
St. Louis County
Phone
Not verified — use the website

Contact details are taken from the agency’s own site or its published fee schedule. Where we have not verified a phone number we leave it blank rather than guess.

Sources

Every fee and term above was read from one of these government pages on the date shown.

  1. 2026 Fee Schedule — Amended by the St. Louis County Board after the Public Hearing on January 27, 2026 (Originally Adopted November 4, 2025 – Resolution No. 25-527)St. Louis County, Minnesota · primary source · retrieved 2026-10-13
  2. Apply for a Septic PermitSt. Louis County Planning & Zoning · primary source · retrieved 2026-10-13
  3. Form 3001, Commercial Construction Application, Subsurface Sewage Treatment System (Rev. 12-30-2025)St. Louis County Planning & Zoning · primary source · retrieved 2026-10-13
  4. Form 3040, SSTS Operating Permit Renewal Application (Rev. 12-30-2025)St. Louis County Planning & Zoning · primary source · retrieved 2026-10-13
  5. Minn. R. 7082.0040, SSTS ordinances and programsMinnesota Office of the Revisor of Statutes · primary source · retrieved 2026-10-13
  6. Onsite Wastewater DivisionSt. Louis County Planning & Zoning · primary source · retrieved 2026-10-13
  7. Ordinance 61 & Technical StandardsSt. Louis County Planning & Zoning · primary source · retrieved 2026-10-13

Other offices serving St. Louis County

The full permit list for this jurisdiction

Industry permit lists that include this agency

Minnesota jurisdictions

Commercial Compliance Hub publishes information, not legal advice. Requirements change — confirm anything you rely on with the issuing agency before you file.